P.W.E. Kowloon.
Q 58
133. Tsimshatsui Police Station Extensions.-This consisted in carrying out certain alterations to the existing building, and adding an additional storey to the East and West wings and over part of the North wing.
This has modernised the building and added considerably to the accommodation, providing new quarters for a married European Sergeant, new recreation room for European staff, increased kitchen accommodation, together with the installation of water-closets for Europeans and water flushed trough-closets for the native staff.
1920 Estimates, $38,000.00
1920 Sup. Vote, 8,500.00
Total Estimates, $46,500.00
Expenditure to 1920 Expenditure, 45,717.06
31/12/20, $45,717.06
134. Latrine adjoining Market Street, Yaumati.-- A Contract was let for this work in March and included the removal of the present latrine and the construction of a latrine on the improved lines now adopted for such structures.
The work was finished in November, and, by the end of the year, all liabilities had been paid.
1920 Estimates, $7,000.00
1920 Sup. Vote, 3,000.00
Total Estimates, $10,000.00
1920 Expenditure, 9,379.30
Expenditure to 31/12/20, $9,379.30
135. Roads:--
(a.) Main Road in Kowloon,— Kowloon City to Mongkoktsui. This work is being carried out in 2 sections and under 2 contracts as under
Section I-Kowloon City to East side of Railway Embankment.-A Contract was let in January for this work, which consists of cutting and filling; good progress had been made by the end of the year.
As the cutting exceeds the filling required for the road width (100 ft.), the low-lying areas adjacent to the road alignment are being filled in to approved levels.
The expenditure on this section during the year amounted to $42,068.64.
Section II,--West of Railway Embankment to Shanghai Street. Mongkoktsui.—A Contract for this section was let in June; it embraces heavy cutting and filling, and the construction of a nullah varying from 24'0" to 30'0" wide along a portion of its length with the necessary cross-road bridges.
As the cutting greatly exceeds the filling required for the road width (100 ft.), the low-lying area East of Shanghai Street is being filled to road formation level with the surplus material.
P.W.E. Kowloon.
Q 58
133. Tsimshatsui Police Station Extensions.-This consisted in carrying out certain alterations to the existing building, and adding an additional storey to the East and West wings and over part of the North wing.
This has modernised the building and added considerably to the accommodation, providing new quarters for a married European Sergeant, new recreation room for European staff, in- creased kitchen accommodation, together with the installation of water-closets for Europeans and water flushed trough-closets for the native staff. 1920 Estimates, 1920 Sup. Vote,
$ 38,000.00 | Total Estimates,.
8,500.00
$46,500.00 Expenditure to
1920 Expenditure,.. 45,717.06 31/12/20,...
$ 45,717.06
134. Lâtrine adjoining Market Street, Yaumati.-- A Con- tract was let for this work in March and included the removal of the present latrine and the construction of a latrine on the improved lines now adopted for such structures.
The work was finished in November, and, by the end of the year, all liabilities had been paid.
1920 Estimates,
1920 Sup. Vote,
$ 7,000.00 | Total Estimates,......
3,000.00
1920 Expenditure,..
$ 10,000.00 9,379.30
135. Roads:--
Expenditure to
31/12/20,........... $ 9,379.30
(a.) Main Road in Kowloon,— Kowloon City to Mongkoktsui. This work is being carried out in 2 sections and under 2 contracts as under
Section I-Kowloon City to East side of Railway Embank- ment.-A Contract was let in January for this work, which consists of cutting and filling; good progress had been made by the end of the year.
As the cutting exceeds the filling required for the road width (100 ft.), the low-lying areas adjacent to the road alignment are being filled in to approved levels.
The expenditure on this section during the year amounted to $42,068.64.
Section 11,--West of Railway Embankment to Shanghai Street. Mongkoktsmi.—A Contract for this section was let in June; it embraces heavy cutting and filling, and the construction of a nullah varying from 24′0′′ to 30'0" wide along a portion of its length with the necessary cross-road bridges.
As the cutting greatly exceeds the filling required for the road width (100 ft.), the low-lying area East of Shanghai Street is being filled to road formation level with the surplus material.