P.W.E. Hongkong.

(c.) Glenealy stream south of Robinson Road.—This work consisted of the training of several stream-courses in Glenealy Valley above Robinson Road.

The channels, which vary in size from 12′0″ × 2′0″ to 12″ x 6″ are formed of cement concrete with a semi-circular invert and vertical sides.

Over a length of 148 feet of stream-bed, operations were confined to filling in holes in the rocky bed with cement concrete. The total lengths trained, exclusive of the length already mentioned, were as follows:-

12'0" × 2'0" 69 feet 27" x 27" 102 24" x 24" 331 15" x 15" 155 12" x 12" 139 Total, 796

The work was completed and paid for before the close of the 1917 Estimates.

1917 Expenditure, $5,500.00 Total Estimates, $2,252.15 Expenditure to 31/12/17, $2,252.15

(d.) General Works. The following is a statement of the works carried out under this heading:

Length trained. Expenditure. (i) Training stream-courses east and west of I.L. 2138, Conduit Road, and diverting central stream-course to the westward. Completion of item (iv) of last year's Report (completed), 305 Lin. Ft. $153.21 (ii) Training stream-course west of R.B.L. 2, Section A, Plantation Road (completed), Cost of work, $165.13 Less contribution by lessee and penalty on contractor, $208.89 Cr. $133.76 97 (iii) Constructing tank for supply from nullah to I.L. 1905, May Road, (completed), Cost of work, $270.79 Less contribution by lessee, $270.79 (iv.) Extension of east wall and invert of No. 7 nullah north of Main Street, Shaukiwan West, (completed), 190 $2,688.90

Edit History

2026-05-06 16:58:21 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
59 P.W.E. Hongkong. (c.) Glenealy stream south of Robinson Road.—This work consisted of the training of several stream-courses in Glenealy Valley above Robinson Road. The channels, which vary in size from 12′0″ × 2′0″ to 12″ x 6″ are formed of cement concrete with a semi-circular invert and vertical sides. Over a length of 148 feet of stream-bed, operations were confined to filling in holes in the rocky bed with cement concrete. The total lengths trained, exclusive of the length already mentioned, were as follows:- 12'0" × 2'0" 69 feet 27" x 27" 102 24" x 24" 331 15" x 15" 155 12" x 12" 139 Total, 796 The work was completed and paid for before the close of the 1917 Estimates. 1917 Expenditure, $5,500.00 Total Estimates, $2,252.15 Expenditure to 31/12/17, $2,252.15 (d.) General Works. The following is a statement of the works carried out under this heading: Length trained. Expenditure. (i) Training stream-courses east and west of I.L. 2138, Conduit Road, and diverting central stream-course to the westward. Completion of item (iv) of last year's Report (completed), 305 Lin. Ft. $153.21 (ii) Training stream-course west of R.B.L. 2, Section A, Plantation Road (completed), Cost of work, $165.13 Less contribution by lessee and penalty on contractor, $208.89 Cr. $133.76 97 (iii) Constructing tank for supply from nullah to I.L. 1905, May Road, (completed), Cost of work, $270.79 Less contribution by lessee, $270.79 (iv.) Extension of east wall and invert of No. 7 nullah north of Main Street, Shaukiwan West, (completed), 190 $2,688.90
Baseline (Original)
59 P.W.E. Hongkong. (c.) Glenealy stream south of Robinson Road.—This work con- sisted of the training of several stream-courses in Glenealy Valley above Robinson Road. The channels, which vary in size from 12′0′′ × 2′0′′ to 12′′ x 6′′ are formed of cement concrete with a semi-circular invert and vertical sides. Over a length of 148 feet of stream-bed, operations were con- fined to filling in holes in the rocky bed with cenient concrete. The total lengths trained, exclusive of the length already mentioned. were as follows:- 12'0" × 2'0" 27" x 27" 69 feet. .102 24" x 24" 15" x 15" ...331 ...155 " 12" x 12"... ...139 Total, ..796 year. The work was completed and paid for before the close of the 1917 Estimates, 1917 Expenditure, $5,500.00 Total Estimates, 2,252.15 Expenditure to 31/12 17, $2.252.15 (d.) General Works. The following is a statement of the works carried out under this heading: Length Expendi- trained. (i) Training stream-courses cast and west of I.L. 2138, Conduit Road, and diverting central stream-course to the westward. Completion of item (iv) of last year's Report (completed), (ii) Training stream-course west of R.B.L. 2, Section A, Plantation Road (completed), Cost of work, Less contribution by lessee and penalty on contractor, Lin. Ft. ture. 305 153.21 $165.13 208.89 Cr. $133.76 97 (iii) Constructing tank for supply from nullahı to I.L. 1905, May Road, (completed), Cost of work, Less contribution by lessee, $270.79 270.79 (iv.) Extension of east wall and invert of No. 7 nullah north of Main Street, Shaukiwan West, (completed), 190 2,688.90
2026-05-06 16:58:21 · Baseline
View content

59

P.W.E. Hongkong.

(c.) Glenealy stream south of Robinson Road.—This work con- sisted of the training of several stream-courses in Glenealy Valley above Robinson Road.

The channels, which vary in size from 12′0′′ × 2′0′′ to 12′′ x 6′′ are formed of cement concrete with a semi-circular invert and vertical sides.

Over a length of 148 feet of stream-bed, operations were con- fined to filling in holes in the rocky bed with cenient concrete. The total lengths trained, exclusive of the length already mentioned. were as follows:-

12'0" × 2'0"

27" x 27"

69 feet. .102

24" x 24"

15" x 15"

...331 ...155

"

12" x 12"...

...139

Total,

..796

year.

The work was completed and paid for before the close of the

1917 Estimates,

1917 Expenditure,

$5,500.00 Total Estimates,

2,252.15

Expenditure to

31/12 17,

$2.252.15

(d.) General Works. The following is a statement of the works carried out under this heading:

Length Expendi- trained.

(i) Training stream-courses cast and west of I.L. 2138, Conduit Road, and diverting central stream-course to the westward. Completion of item (iv) of last year's Report (completed),

(ii) Training stream-course west of R.B.L. 2,

Section A, Plantation Road (completed),

Cost of work,

Less contribution by lessee and

penalty on contractor,

Lin. Ft.

ture.

305 153.21

$165.13

208.89

Cr. $133.76

97

(iii) Constructing tank for supply from nullahı to I.L. 1905, May Road, (completed),

Cost of work,

Less contribution by lessee,

$270.79

270.79

(iv.) Extension of east wall and invert of No. 7 nullah north of Main Street, Shaukiwan West, (completed),

190 2,688.90

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.