AnnualReport-1917 — Page 408

Administrative Reports 行政報告書 All AI Reviewed

P.W.E. Hongkong.

102. Training Nullahs:

58

(a) Stream in Sookunpoo Valley. A general description of this work was given in last year's Report. The work executed during 1917 comprised the completion of the training of the main stream-course; the training of several small branch streams along the south side of the valley and the completion of the filling-in of the swampy area to the coping level of the nullah walls. The small branch channels, which vary in size and capacity, were formed of cement concrete.

The following are the sizes and lengths of the channels constructed during the year, these being additional to the length of 1,001 feet of main nullah mentioned in last year's Report:

Average size, 8′0′′ × 8′0′′ 354 feet 8'3" x 7'0" 282 6′6′′ × 5'9" 476 6'6"×4'9" 252 5′3′′ × 4'6" 293 4'6" x 4'0" 120 4'0" x 4'0" 242 3'3" x 3'0" 23 2'0" x 2'0" 571 various small channels 780 3,393

The work was completed and all liabilities were discharged before the close of the year.

1917 Estimates, $31,400.00 Total Estimates, $32,738.91 1917 Sup. Vote, 1,338.91 Expenditure to 31/12/17, $32,738.91 $51,400.00 1917 Expenditure, 32,738.91 52,738.81

(b) Mount Kellett.-This work was undertaken on account of the prevalence of mosquitoes in the Mount Kellett District and was completed during the year so far as it is proposed at present to proceed with it. It comprised the training of several small stream-courses on the east and west sides of Mount Kellett. The channels which vary in size from 24" x 24" to 9"x9" are formed of cement concrete with a semi-circular invert and vertical sides. The total lengths trained were as follows:-

24" x 24" 63 feet 21" x 21" 708 18" x 18" 383 15" x 15" 874 12" x 12" 789 9"× 9" 466 Total, 3,283 1917 Estimates, $5,000.00 Total Estimates, $5,350.00 1917 Sup. Vote, 350.00 Expenditure to 31/12/17, $5,335.05 $9,400.00 1917 Expenditure, 5,335.05

Edit History

2026-05-06 16:58:11 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P.W.E. Hongkong. 102. Training Nullahs: 58 (a) Stream in Sookunpoo Valley. A general description of this work was given in last year's Report. The work executed during 1917 comprised the completion of the training of the main stream-course; the training of several small branch streams along the south side of the valley and the completion of the filling-in of the swampy area to the coping level of the nullah walls. The small branch channels, which vary in size and capacity, were formed of cement concrete. The following are the sizes and lengths of the channels constructed during the year, these being additional to the length of 1,001 feet of main nullah mentioned in last year's Report: Average size, 8′0′′ × 8′0′′ 354 feet 8'3" x 7'0" 282 6′6′′ × 5'9" 476 6'6"×4'9" 252 5′3′′ × 4'6" 293 4'6" x 4'0" 120 4'0" x 4'0" 242 3'3" x 3'0" 23 2'0" x 2'0" 571 various small channels 780 3,393 The work was completed and all liabilities were discharged before the close of the year. 1917 Estimates, $31,400.00 Total Estimates, $32,738.91 1917 Sup. Vote, 1,338.91 Expenditure to 31/12/17, $32,738.91 $51,400.00 1917 Expenditure, 32,738.91 52,738.81 (b) Mount Kellett.-This work was undertaken on account of the prevalence of mosquitoes in the Mount Kellett District and was completed during the year so far as it is proposed at present to proceed with it. It comprised the training of several small stream-courses on the east and west sides of Mount Kellett. The channels which vary in size from 24" x 24" to 9"x9" are formed of cement concrete with a semi-circular invert and vertical sides. The total lengths trained were as follows:- 24" x 24" 63 feet 21" x 21" 708 18" x 18" 383 15" x 15" 874 12" x 12" 789 9"× 9" 466 Total, 3,283 1917 Estimates, $5,000.00 Total Estimates, $5,350.00 1917 Sup. Vote, 350.00 Expenditure to 31/12/17, $5,335.05 $9,400.00 1917 Expenditure, 5,335.05
Baseline (Original)
P.W.E. Hongkong. 102. Training Nullahs: 58 (a) Stream in Sookunpoo Valley. A general description of this work was given in last year's Report. The work executed during 1917 comprised the completion of the training of the main stream- course; the training of several small branch streams along the south side of the valley and the completion of the filling-in of the swampy area to the coping level of the nullah walls. The small branch channels, which vary in size and capacity, were formed of cement concrete. The following are the sizes and lengths of the channels con- structed during the year, these being additional to the length of 1,001 feet of main nullah mentioned in last year's Report - Average size, 8′0′′ × 8′0′′. 354 feet. 8'3" x 7'0" 282 6′6′′ × 5'9" 476 6'6"×4'9" .252 5′3′′ × 4'6". 293 X 4'6" x 4'0". 120 T 4'0" x 4'0". 242 " 3'3" x 3'0". 23 2'0" x 2'0". .571 various small channels, .780 39 3,393 The work was completed and all liabilities were discharged be- fore the close of the year. 1917 Estimates, 1917 Sup. Vote, $31,400.00 Total Estimates, 1,338.91 $32,738.91 | Expenditure to 31/12/17, 1917 Expenditure,... 32,738.91 $51,400,00 52,738.81 (b.) Mount Kellett.-This work was undertaken on account of the prevalence of mosquitoes in the Mount Kellett District and was completed during the year so far as it is proposed at present to proceed with it. It comprised the training of several small stream- courses on the east and west sides of Mount Kellett. The channels which vary in size from 24" x 24" to 9"x9" are formed of conient concrete with a semi-circular invert and vertical sides. The total lengths trained were as follows:- 24" x 24" 63 feet. 21" x 21" X 708 18" x 18" 383 15" x 15" 874 12" x 12" 789 >1 9"× 9" 466 Total,. 3,283 1917 Estimates, 1917 Sup. Vote,. $5,000.00 | Total Estimates,. 350.00 $9,400,00 $5,350.00 1917 Expenditure,...... 5,335.05 Expenditure to 31/12 17. 5,335.05
2026-05-06 16:58:11 · Baseline
View content

P.W.E. Hongkong.

102. Training Nullahs:

58

(a) Stream in Sookunpoo Valley. A general description of this work was given in last year's Report. The work executed during 1917 comprised the completion of the training of the main stream- course; the training of several small branch streams along the south side of the valley and the completion of the filling-in of the swampy area to the coping level of the nullah walls. The small branch channels, which vary in size and capacity, were formed of cement

concrete.

The following are the sizes and lengths of the channels con- structed during the year, these being additional to the length of 1,001 feet of main nullah mentioned in last year's Report -

Average size, 8′0′′ × 8′0′′.

354 feet.

8'3" x 7'0"

282

6′6′′ × 5'9"

476

6'6"×4'9"

.252

5′3′′ × 4'6".

293

X

4'6" x 4'0".

120

T

4'0" x 4'0".

242

"

3'3" x 3'0".

23

2'0" x 2'0".

.571

various small channels,

.780

39

3,393

The work was completed and all liabilities were discharged be-

fore the close of the year.

1917 Estimates,

1917 Sup. Vote,

$31,400.00 Total Estimates,

1,338.91

$32,738.91 | Expenditure to

31/12/17,

1917 Expenditure,... 32,738.91

$51,400,00

52,738.81

(b.) Mount Kellett.-This work was undertaken on account of the prevalence of mosquitoes in the Mount Kellett District and was completed during the year so far as it is proposed at present to proceed with it. It comprised the training of several small stream- courses on the east and west sides of Mount Kellett. The channels which vary in size from 24" x 24" to 9"x9" are formed of conient concrete with a semi-circular invert and vertical sides. The total lengths trained were as follows:-

24" x 24"

63 feet.

21" x 21"

X

708

18" x 18"

383

15" x 15"

874

12" x 12"

789

>1

9"× 9"

466

Total,.

3,283

1917 Estimates, 1917 Sup. Vote,.

$5,000.00 | Total Estimates,.

350.00

$9,400,00

$5,350.00

1917 Expenditure,...... 5,335.05

Expenditure to

31/12 17.

5,335.05