Q 69

P.W.E. Kowloon.

P.W.E. KOWLOON.

116. Roads,--General Works.-The following is a statement of the works executed under this heading :-

(i.) Canton Road and Reclamation Street between Waterloo Road and Pitt Street-Raising, kerbing, channelling, macadamising carriageways, laying granolithic footways, concreting scavenging lane and providing the necessary drainage,

(ii.) Constructing a road, 8′0′′ wide, to give access to N.K.F.L.'s 7 and 8,

$3,526.81

(iii) Nathan Road :-

Kerbing, channelling and laying granolithic paving adjoining K.I.L. 571, (half width only),

Forming, channelling and surfacing with decomposed granite (half width of roadway) at rear of K.I.L. 1293; adjusting kerbing, laying new channelling and granolithic paving in front of lot,

1,357.02

$1,310.04

1,181.32

2,491.36

(iv) Hunghom-Kowloon City Road--Erecting dwarf wall and forming channelling opposite Shek Shan Quarry Lot No. 6 to prevent the road being damaged by heavy rains,

(v.) Sham Chun Street-Raising, kerbing and channelling adjoining K.I.L.'s 58-63 including concreting side lane and providing the necessary drainage,

(vi.) Pitt Street (between Disinfecting Station and Steam Laundry)-Relaying kerbing and channelling and reforming and macadamising carriageway,

(vii.) Jordan Road-Kerbing, channelling and surfacing road (half width) on east side of K.I.L. 1294 and laying granolithic footway on north, south and east sides of lot,

1,115.78

855.78

$51.74

673.01

(viii) Portland Street:-

Raising carriageway, kerbing, channelling and laying decomposed granite footway opposite K.I.L. 1217,

$611.43

Kerbing, channelling and laying granolithic paving opposite K.I.L. 1218,

182.52

Channelling and paving scavenging lane at rear of K.I.L.'s 948, 949 and 975,

175.34

969.29

Share This Page