(c.) General Works. The following is a statement of the principal works carried out under this heading:
(i.) Pokfulam Road-Forming, surfacing and channelling road diversion past Belcher's Battery,
(ii) Centre Street and Bonham Road-Reconstructing flight of steps at top of Centre Street, improving alignment of Bonham Road and surfacing with tar macadam,.......
(iii) Sands and North Streets-Forming, surfacing, kerbing, channelling and paving portions of footways south of Belcher's Street,
$ 1,988.91
1,966.19
1,491.45
(iv.) Ship Street-Extending roadway southwards with granite steps and granolithic footway,
1,136.36
891.59
(v.) Broadwood Road-Forming, surfacing, kerbing and channelling and paving footways,
(vi.) Catchick Street, Belcher's Street and Smithfield-Kerbing and channelling around new houses on I.L. 1297,
(vii.) Shaukiwan Road-Kerbing, channelling, paving portion of footway in front of I.L. 1723, and raising roadway,
674.24
642.66*
(viii.) Tai Hang-Kerbing, channelling and paving in front of houses on I.L. 2040,
632.62
Kerbing, channelling and paving in front of houses on I.L. 2087,
228.43
861.05
(ix) Leighton Hill Road-Kerbing, channelling and laying granolithic footway opposite new houses on I.L. 729,
(x.) Shaukiwan Village--Forming approach path at side of nullah, kerbing and paving for access to new houses on S.I.L.'s 420-422,
(xi.) Praya East-Forming channel westwards from Spring Gardens Lane, north side of road,
595.21
574.74*
466.06
(xii.) Wongneichong Road-Paving opposite new houses on I.L. 2039,
471.45
(xiii) Caine Road-Altering alignment of road at junction with Seymour Road,
393.94
(xiv.) Shaukiwan Road-Relaying kerb with steps and channel and laying granolithic slabs in front of houses on I.L. 2086,
* Granolithic paving was paid for by the frontagers.
373.73
P.W.E. Hongkong.
Q 34
(c.) General Works. The following is a statement of the prin- cipal works carried out under this heading:
(i.) Pokfulam Road-Forming, surfacing and channelling road diversion past Belcher's Battery,
(ii) Centre Street and Bonham Road-Recon- structing flight of steps at top of Centre Street, improving alignment of Bonham Road and surfacing with tar macadam,.......
(iii) Sands and North Streets-Forming, surfac- ing, kerbing, channelling and paving portions of footways south of Belcher's Street,
$ 1,988.91
1,966.19
1,491.45
(iv.) Ship Street-Extending roadway southwards with granite steps and granolithic foot-
way,
1,136.36
891.59
(v.) Broadwood Road-Forming, surfacing, kerb- ing and channelling and paving footways, (vi.) Catchick Street, Belcher's Street and Smith- field-Kerbing and channelling around new houses on I.L. 1297,
(vii.) Shaukiwan Road-Kerbing, channelling, paving portion of footway in front of I.L. 1723, and raising roadway,.
674.24
642.66*
(viii.) Tai Hang-Kerbing, channelling and paving in front of houses
on I.L. 2040,
632.62
Kerbing, channelling and
İ.L. 2087,
paving in front of houses on
228.43
861.05
(ix) Leighton Hill Road-Kerbing, channelling and laying granolithic footway opposite new houses on I.L. 729,
(x.) Shaukiwan Village--Forming approach path at side of nullah, kerbing and paving for access to new houses on S.I.L.'s 420-422, (xi.) Praya East-Forming channel westwards from Spring Gardens Lane, north side of road,
595.21
574.74*
466.06
(xii.) Wongneichong Road-Paving opposite new
houses on IL. 2039,
471.45
(xiii) Caine Road-Altering alignment of road at junction with Seymour Road,.
393.94
(xiv.) Shaukiwan Road-Relaying kerb with steps and channel and laying granolithic slabs. in front of houses on I.L. 2086,
* Granolithic paving was paid for by the frontagers.
373.73