(c.) General Works. The following is a statement of the principal works carried out under this heading:

(i.) Pokfulam Road-Forming, surfacing and channelling road diversion past Belcher's Battery,

(ii) Centre Street and Bonham Road-Reconstructing flight of steps at top of Centre Street, improving alignment of Bonham Road and surfacing with tar macadam,.......

(iii) Sands and North Streets-Forming, surfacing, kerbing, channelling and paving portions of footways south of Belcher's Street,

$ 1,988.91

1,966.19

1,491.45

(iv.) Ship Street-Extending roadway southwards with granite steps and granolithic footway,

1,136.36

891.59

(v.) Broadwood Road-Forming, surfacing, kerbing and channelling and paving footways,

(vi.) Catchick Street, Belcher's Street and Smithfield-Kerbing and channelling around new houses on I.L. 1297,

(vii.) Shaukiwan Road-Kerbing, channelling, paving portion of footway in front of I.L. 1723, and raising roadway,

674.24

642.66*

(viii.) Tai Hang-Kerbing, channelling and paving in front of houses on I.L. 2040,

632.62

Kerbing, channelling and paving in front of houses on I.L. 2087,

228.43

861.05

(ix) Leighton Hill Road-Kerbing, channelling and laying granolithic footway opposite new houses on I.L. 729,

(x.) Shaukiwan Village--Forming approach path at side of nullah, kerbing and paving for access to new houses on S.I.L.'s 420-422,

(xi.) Praya East-Forming channel westwards from Spring Gardens Lane, north side of road,

595.21

574.74*

466.06

(xii.) Wongneichong Road-Paving opposite new houses on I.L. 2039,

471.45

(xiii) Caine Road-Altering alignment of road at junction with Seymour Road,

393.94

(xiv.) Shaukiwan Road-Relaying kerb with steps and channel and laying granolithic slabs in front of houses on I.L. 2086,

* Granolithic paving was paid for by the frontagers.

373.73