gratings, bringing the total number dealt with up to the close of the year to 696 gullies with single gratings and 721 gullies with double gratings.
$98,000.00
1909. Estimates, ...$2,000.00 Total Estimates, 1909. Expenditure, $1,252.75 Expenditure to 31/12/09, $92,936.13.
84. Training Nullahs.-The following is a statement of the works carried out under this heading :-
Length Trained. Expenditure. Lin. Ft. $ (i.) Nullah in Waterloo Road, Kowloon, from Railway Bridge No. 4 towards Disinfecting Station (not completed), 1,617 999 (ii.) Channel for stream near Wanchai Gap and below Coombe Road (completed), and Shaukiwan Road (completed), 3401909. Estimates,.. $20,000.00.
1909. Expenditure... $3,993.07.
85. Large Flushing Tanks for Main Sewers and Substitution of Iron for Earthenware Pipes.-No new flushing tank was undertaken but iron pipes were substituted for earthenware pipes in the case of a portion of the Bonham Road sewer, East of Eastern Street.
The portion dealt with comprised 440 yards of 10" diameter pipes.
Cast Iron pipes, 10" diameter, to be laid in substitution for earthenware ones in Garden Road were deposited on the site, but the work was not commenced. The length to be undertaken was about 140 yards.
1909. Estimates, $5,000.00 | Total Estimates, 1909. Expenditure, 4,770.25 | Expenditure to 31/12/09, $19,252.58.
86. Miscellaneous Drainage Works.-Extensive works were carried out under this heading. The following is a statement of the principal items, the amounts stated representing in some cases only a portion of the cost owing to the work extending into more than one year :
HONGKONG.
(i.) Raising sunken sewer, Connaught Road West, and works in connection therewith (not completed), $10,416 (ii) Training nullah South of No. 8 Bridge, Shaukiwan (264 lineal feet), 3,7450 32
J
gratings, bringing the total number dealt with up to the close of the year to 696 gullies with single gratings and 721 gullies with double gratings.
$98,000.00
1909. Estimates, ...$2,000.00 Total Estimates, 1909. Expenditure, $1,252.75 Expenditure to 31/12/09, $92,936.13.
84. Training Nullahs.-The following is a statement of the works carried out under this heading :-
Length Trained. Expenditure.
Lin. Ft.
$
(iii) Nullah between Inland Lots 1,617
(i.) Nullah in Waterloo Road, Kowloon, from Railway Bridge No. 4 to- wards Disinfecting Station (not completed),.
(ii.) Channel for stream near Wanchai Gap and below Coombe Road (completed),
and 1,618, Shaukiwan Road (com- pleted),
340
1,698
390
999
182
585
(iv.) Nullah between Inland Lots 1,523 &
1,570, Bowen Road (completed)...
70
262
1909. Estimates,..
$20,000.00.
$ 3,993.07.
1909. Expenditure...
85. Large Flushing Tanks for Main Sewers and Substitution of Iron for Earthenware Pipes.-No new flushing tank was under- taken but iron pipes were substituted for earthenware pipes in the case of a portion of the Bonham Road sewer, East of Eastern Street.
The portion dealt with comprised 440 yards of 10" diameter pipes.
Cast Iron pipes, 10" diameter, to be laid in substitution for earthenware ones in Garden Road were deposited on the site, but the work was not commenced. The length to be undertaken was about 140 yards.
1909. Estimates, .$5,000.00 | Total Estimates, 1909. Expenditure, 4,770.25 | Expenditure to 31/12/09, $19,252.58.
86. Miscellaneous Drainage Works.-Extensive works were carried out under this heading. The following is a statement of the principal items, the amounts stated representing in some cases only a portion of the cost owing to the work extending into more than one year :---
HONGKONG.
(i.) Raising sunken sewer, Connaught Road West, and works in connection therewith (not completed),
(ii) Training nullah South of No. 8 Bridge, Shau-
kiwan (264 lineal feet),
$10,416
3,745