The nullah is constructed of concrete (partly cement and partly lime), the side-walls being faced with rubble masonry; the egg-shaped and circular culverts are composed of cement concrete, the former being supported on piles.

Item (ix). This work was rendered necessary on account of the insanitary condition of the locality, caused by the discharge of foul water into the open nullahs in Soy and Nullah Streets.

It comprises the construction of a system of pipe sewers varying in diameter from 6″ to 15", connected with an existing outfall at Dundas Street, and various connections from private properties and street gullies. The 15" pipe sewer in Macdonnell Road is supported on a concrete and piled-foundation.

Item (x). This extension was stipulated for in an agreement with the late lessee of Kowloon Inland Lot 1133, whereby a readjustment of the boundaries of his lots was made to admit of the construction of main throughfares.

It comprises the laying of a pipe sewer, 6" to 9" in diameter, extending from the junction of Fifth and Kennedy Streets to Kowloon Inland Lot 1133.

84. Extensions of Lighting.-The following lamps were erected or fitted with lanterns and burners:—

Kennedy Road,
Kennedy Town Pier,
CITY AND HILL DISTRICT.
Government House (lantern, &c. only),
Algar Court (paid for by owner),
Lamont's Lane (do.)....
Mount Kellett Road, The Peak,
Hau Fung Lane (provided by owner),....

1 1 1 1 8

Deduct lamps removed from Blake Pier,.....

As regards the lamp in Hau Fung Lane, the lighting was taken over by Government in consequence of the surrender by the owner of Inland Lots Nos. 260 and 1731 of the scavenging lane and right-of-way pertaining to these lots.

Nullah Street, Mongkoktsui..
KOWLOON.
Macdonnell Road (re-named Canton Road), Yaumati, Reclamation Street, Yaumati,

1908. Estimates,.....$2,500.00
1908. Expenditure, 527.50

1 2 1

85. Permanent Marks for Traverse Survey Points in New Territories.-Owing to insufficiency of staff in the first instance and pressure of important work subsequently, it was not found possible to proceed with this work.

1908. Estimates,...$3,000.00
1908. Expenditure, 314.65
Total Estimates, .....$11,000.00
Expenditure to 31/12/08,

86. Reinforced Concrete Piers.-A wrought iron shed with matting roof was erected in the yard at Wanchai referred to in last year's report and the yard itself was surfaced with lime and cement concrete. The necessary moulds were then prepared and 27 reinforced concrete piles were made for the Kowloon City Pier which was to be put in hand in priority to the Green Island and Harbour Office Piers, but it was not possible to do any work on these last named up to the end of the year owing to the want of a Crane Barge.

1908. Estimates,.$19,000.00
1908. Expenditure, 4,230.53
Total Estimates,..........$54,300.00
Expenditure to 31/12/08, 11,574.60

87. Blake Pier Shelter.-A contract was let to Messrs. Sang Lee & Co. in March for the manufacture of the granolithic slabs and rolls, with which it was decided to cover the roof, and the whole of these were completed in August. The columns, steel trusses, etc.,

Edit History

2026-05-05 22:51:35 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P 25 The nullah is constructed of concrete (partly cement and partly lime), the side-walls being faced with rubble masonry; the egg-shaped and circular culverts are composed of cement concrete, the former being supported on piles. Item (ix). This work was rendered necessary on account of the insanitary condition of the locality, caused by the discharge of foul water into the open nullahs in Soy and Nullah Streets. It comprises the construction of a system of pipe sewers varying in diameter from 6″ to 15", connected with an existing outfall at Dundas Street, and various connections from private properties and street gullies. The 15" pipe sewer in Macdonnell Road is supported on a concrete and piled-foundation. Item (x). This extension was stipulated for in an agreement with the late lessee of Kowloon Inland Lot 1133, whereby a readjustment of the boundaries of his lots was made to admit of the construction of main throughfares. It comprises the laying of a pipe sewer, 6" to 9" in diameter, extending from the junction of Fifth and Kennedy Streets to Kowloon Inland Lot 1133. 84. Extensions of Lighting.-The following lamps were erected or fitted with lanterns and burners:— Kennedy Road, Kennedy Town Pier, CITY AND HILL DISTRICT. Government House (lantern, &c. only), Algar Court (paid for by owner), Lamont's Lane (do.).... Mount Kellett Road, The Peak, Hau Fung Lane (provided by owner),.... 1 1 1 1 8 Deduct lamps removed from Blake Pier,..... As regards the lamp in Hau Fung Lane, the lighting was taken over by Government in consequence of the surrender by the owner of Inland Lots Nos. 260 and 1731 of the scavenging lane and right-of-way pertaining to these lots. Nullah Street, Mongkoktsui.. KOWLOON. Macdonnell Road (re-named Canton Road), Yaumati, Reclamation Street, Yaumati, 1908. Estimates,.....$2,500.00 1908. Expenditure, 527.50 1 2 1 85. Permanent Marks for Traverse Survey Points in New Territories.-Owing to insufficiency of staff in the first instance and pressure of important work subsequently, it was not found possible to proceed with this work. 1908. Estimates,...$3,000.00 1908. Expenditure, 314.65 Total Estimates, .....$11,000.00 Expenditure to 31/12/08, 86. Reinforced Concrete Piers.-A wrought iron shed with matting roof was erected in the yard at Wanchai referred to in last year's report and the yard itself was surfaced with lime and cement concrete. The necessary moulds were then prepared and 27 reinforced concrete piles were made for the Kowloon City Pier which was to be put in hand in priority to the Green Island and Harbour Office Piers, but it was not possible to do any work on these last named up to the end of the year owing to the want of a Crane Barge. 1908. Estimates,.$19,000.00 1908. Expenditure, 4,230.53 Total Estimates,..........$54,300.00 Expenditure to 31/12/08, 11,574.60 87. Blake Pier Shelter.-A contract was let to Messrs. Sang Lee & Co. in March for the manufacture of the granolithic slabs and rolls, with which it was decided to cover the roof, and the whole of these were completed in August. The columns, steel trusses, etc.,
Baseline (Original)
P 25 The nullah is constructed of concrete (partly cement and partly lime), the side-walls being faced with rubble masonry; the egg-shaped and circular culverts are composed of cement concrete, the former being supported on piles. Item (ix). This work was rendered necessary on account of the insanitary condition of the locality, caused by the discharge of foul water into the open nullahs in Soy and Nullahı Streets. It comprises the construction of a system of pipe sewers varying in diameter from 6′′ to 15", connected with an existing outfall at Dundas Street, and various connections from private properties and street gullies. The 15" pipe sewer in Macdonnell Road is supported on a concrete and piled-foundation. Item (x). This extension was stipulated for in an agreement with the late lessee of Kowloon Inland Lot 1133, whereby a readjustment of the boundaries of his lots was made to admit of the construction of main throughfares. It comprises the laying of a pipe sewer, 6" to 9" in diameter, extending from the junction of Fifth and Kennedy Streets to Kowloon Inland Lot 1133. 84. Extensions of Lighting.-The following lamps were erected or fitted with lanteros and burners :— Kennedy Road, Kennedy Town Pier,.: CITY AND HILL DISTRICT. Government House (lantern, &c. only), Algar Court (paid for by owner),. Lamont's Lane ( do. ).... Mount Kellett Road, The Peak, Hau Fung Lane (provided by owner),.... I 1 1 } 1 8 Deduct lamps removed from Blake Pier,..... As regards the lamp in Hau Fung Lane, the lighting was taken over by Government in consequence of the surrender by the owner of Inland Lots Nos. 260 and 1731 of the scavenging lane and right-of-way pertaining to these lots. Nullah Street, Mongkoktsui.. KOWLOON. Macdonnell Road (re-named Canton Road), Yaumati, Reclamation Street, Yaumati, 1908. Estimates,..... 1908. Expenditure, .$2,500.00 527.50 1 2 1 85. Permanent Marks for Traverse Survey Points in New Territories.-Owing to insufficiency of staff in the first instance and pressure of important work subsequently, it was not found possible to proceed with this work. 1908. Estimates,... 1908. Expenditure, .$3,000.00 Total Estimates, .... .$11,000.00 Expenditure to 31/12/08, 314.65 86. Reinforced Concrete Piers.-A wrought iron shed with matting roof was erected in the yard at Wanchai referred to in last year's report and the yard itself was surfaced with lime and cement concrete. The necessary moulds were then prepared and 27 rein- forced concrete piles were made for the Kowloon City Pier which was to be put in hand in priority to the Green Island and Harbour Office Piers, but it was not possible to do any work on these last named up to the end of the year owing to the want of a Crane Barge. 1908. Estimates,. 1908. Expenditure, .$19,000.00 4,230.53 Total Estimates,..........$54,300.00 Expenditure to 31/12/08, 11,574.60 87. Blake Pier Shelter.-A contract was let to Messrs. Sang Lee & Co. in March for the manufacture of the granolithic slabs and rolls, with which it was decided to cover the roof, and the whole of these were completed in August. The columns, steel trusses, etc.,
2026-05-05 22:51:35 · Baseline
View content

P 25

The nullah is constructed of concrete (partly cement and partly lime), the side-walls being faced with rubble masonry; the egg-shaped and circular culverts are composed of cement concrete, the former being supported on piles.

Item (ix). This work was rendered necessary on account of the insanitary condition of the locality, caused by the discharge of foul water into the open nullahs in Soy and Nullahı Streets.

It comprises the construction of a system of pipe sewers varying in diameter from 6′′ to 15", connected with an existing outfall at Dundas Street, and various connections from private properties and street gullies. The 15" pipe sewer in Macdonnell Road is supported on a concrete and piled-foundation.

Item (x). This extension was stipulated for in an agreement with the late lessee of Kowloon Inland Lot 1133, whereby a readjustment of the boundaries of his lots was made to admit of the construction of main throughfares.

It comprises the laying of a pipe sewer, 6" to 9" in diameter, extending from the junction of Fifth and Kennedy Streets to Kowloon Inland Lot 1133.

84. Extensions of Lighting.-The following lamps were erected or fitted with lanteros and burners :—

Kennedy Road,

Kennedy Town Pier,.:

CITY AND HILL DISTRICT.

Government House (lantern, &c. only),

Algar Court (paid for by owner),.

Lamont's Lane (

do. )....

Mount Kellett Road, The Peak,

Hau Fung Lane (provided by owner),....

I

1

1

}

1

8

Deduct lamps removed from Blake Pier,.....

As regards the lamp in Hau Fung Lane, the lighting was taken over by Government in consequence of the surrender by the owner of Inland Lots Nos. 260 and 1731 of the scavenging lane and right-of-way pertaining to these lots.

Nullah Street, Mongkoktsui..

KOWLOON.

Macdonnell Road (re-named Canton Road), Yaumati, Reclamation Street, Yaumati,

1908. Estimates,.....

1908. Expenditure,

.$2,500.00 527.50

1

2

1

85. Permanent Marks for Traverse Survey Points in New Territories.-Owing to insufficiency of staff in the first instance and pressure of important work subsequently, it was not found possible to proceed with this work.

1908. Estimates,...

1908. Expenditure,

.$3,000.00 Total Estimates, .... .$11,000.00 Expenditure to 31/12/08, 314.65

86. Reinforced Concrete Piers.-A wrought iron shed with matting roof was erected in the yard at Wanchai referred to in last year's report and the yard itself was surfaced with lime and cement concrete. The necessary moulds were then prepared and 27 rein- forced concrete piles were made for the Kowloon City Pier which was to be put in hand in priority to the Green Island and Harbour Office Piers, but it was not possible to do any work on these last named up to the end of the year owing to the want of a Crane Barge.

1908. Estimates,.

1908. Expenditure,

.$19,000.00 4,230.53

Total Estimates,..........$54,300.00 Expenditure to 31/12/08, 11,574.60

87. Blake Pier Shelter.-A contract was let to Messrs. Sang Lee & Co. in March for the manufacture of the granolithic slabs and rolls, with which it was decided to cover the roof, and the whole of these were completed in August. The columns, steel trusses, etc.,