259
SUMMARY Or Cost.
Itema
Railway No. 1.
Bailway No. 3.
Railway No. 8.
Lined throughout with Brick in Cement.
Karthworks
*
Mining earth and boulders, 45 square yards x 50 - 2,250 cubic yards at $4 Mining rock, 45 square yards x 700 = 31,500 cubic yards at $10 ... Lining of brick in cement, 12 square yards × 750 9,000 cubic yards at $25 Two faces, 2 x 100 cubic yards excavation 200 cubic yards at $2 Two faces, 2 x 200 cubic yards masonry 400 cubic yards at $10
Cost of Tunnel, 287 yards long.
Peg 34,950 to Peg 35,810.
Lined throughout with Brick in Cement.
$9,000 315,000
Dollars.
651,700
Dollars.
Dollars.
1,394,400
305,200
Tunnele
1,833,200
759,550
225,000
400
Bridgee
393,000
530,000
73,000
4,000
Bank protection
249,250
251,800
$553,400
Permanent way and sidings
692,500
982,500
233,500
Stations
300,000
306,000
39,000
Administration, &c. ...
100,000
136,000
32,000
Works
4,209,650
4,360,250
682,700
Surveys
35,850
46,900
1,300
Mining earth and boulders, 45 square yards × 50 – 2,250 cubic yards
at $4
$9,000
Accommodation and compen-
sation.
10,000
17,000
4,000
Mining rock, 45 square yards × 237 10,665 cubic yards at $10. Lining of brick în cement, 12 square yards × 287 3,444 cubic yards
at $25
106,650
Contingencies
215,000
340,000
40,000
Total cost
4,470,300
4,784,150
86,100
728,000
Two faces, as above
Second tunnel
First tunnel
4,400
$206,150 553,400
Total cost per mile
207,930
140,122
88,564
ANALYSIS OF COST PER MILE.
། ། ། །་།
PUBLIC RECORD OFFICE
wwiwmílu
Reference :--
61
C.O. 882
6
PUBLIC RECORD OFFICE, LONDON ALLY WITHOUT PERMISSION OF THE BE REPRODUCED PHOTOGRAPHIC-
COPYRIGHT PHOTOGRAPH-NOT TO
$759,550
Items.
Bailway No. 1.
Railway No. 2.
Railway No. 8.
Or $732.45 per linear yard.
Dollars,
Dollars.
Dollars.
Surveys
1,667
1,379
158
RAILWAY No. 3.
Earth works
30,312
41,012
37,129
Permanent Way.
Tunnels
85,266
22,340
Miles.
Bridges
18,279
15,588
8,880
Main line
8:22
Sidings-Un Long
1
Bank protection
11,593
7,406
+
Total permanent way
9.22
Permanent-way
31;744
28,897
28,406
Stations
...
13,953
9,000
4,744
9-22 Miles of permanent way at $25,000
$230,500
Administration
4,651
4,000
3,895
6 Sets of points and crossings at $500 ...
3,000
Compensation
465
500
486
$233,500
Contingencies
10,000
10,000
4,866
Total cost per mile
D
207,990
140,122
88,564
Station.
Un Long-Station building
$6,000
41366
Platform
5,000
>>
No. 172.
Platform cover
4,000
11
Goods shed
8,000
Water tank
3,000
11
"
Signalling
6,000
Telegraph
4,000
22
Station appliances
3,000
(Confidential.)
SIR,
$39,000
FOREIGN OFFICE to COLONIAL OFFICE.
(Received November 21, 1905.)
[Answered by No. 175.]
Foreign Office, November 20, 1905. WITH reference to previous correspondence respecting the Hankow-Canton Railway Concession, I am directed by the Marquess of Lansdowne to state, for the information of the Secretary of State for the Colonies, that on the 5th instant the