SUMMARY Or Cost.

Itema

Railway No. 1.

Bailway No. 3.

Railway No. 8.

Lined throughout with Brick in Cement.

Karthworks

*

Mining earth and boulders, 45 square yards x 50 - 2,250 cubic yards at $4 Mining rock, 45 square yards x 700 = 31,500 cubic yards at $10 ... Lining of brick in cement, 12 square yards × 750 9,000 cubic yards at $25 Two faces, 2 x 100 cubic yards excavation 200 cubic yards at $2 Two faces, 2 x 200 cubic yards masonry 400 cubic yards at $10

Cost of Tunnel, 287 yards long.

Peg 34,950 to Peg 35,810.

Lined throughout with Brick in Cement.

$9,000 315,000

Dollars.

651,700

Dollars.

Dollars.

1,394,400

305,200

Tunnele

1,833,200

759,550

225,000

400

Bridgee

393,000

530,000

73,000

4,000

Bank protection

249,250

251,800

$553,400

Permanent way and sidings

692,500

982,500

233,500

Stations

300,000

306,000

39,000

Administration, &c. ...

100,000

136,000

32,000

Works

4,209,650

4,360,250

682,700

Surveys

35,850

46,900

1,300

Mining earth and boulders, 45 square yards × 50 – 2,250 cubic yards

at $4

$9,000

Accommodation and compen-

sation.

10,000

17,000

4,000

Mining rock, 45 square yards × 237 10,665 cubic yards at $10. Lining of brick în cement, 12 square yards × 287 3,444 cubic yards

at $25

106,650

Contingencies

215,000

340,000

40,000

Total cost

4,470,300

4,784,150

86,100

728,000

Two faces, as above

Second tunnel

First tunnel

4,400

$206,150 553,400

Total cost per mile

207,930

140,122

88,564

ANALYSIS OF COST PER MILE.

། ། ། །་།

PUBLIC RECORD OFFICE

wwiwmílu

Reference :--

61

C.O. 882

6

PUBLIC RECORD OFFICE, LONDON ALLY WITHOUT PERMISSION OF THE BE REPRODUCED PHOTOGRAPHIC-

COPYRIGHT PHOTOGRAPH-NOT TO

$759,550

Items.

Bailway No. 1.

Railway No. 2.

Railway No. 8.

Or $732.45 per linear yard.

Dollars,

Dollars.

Dollars.

Surveys

1,667

1,379

158

RAILWAY No. 3.

Earth works

30,312

41,012

37,129

Permanent Way.

Tunnels

85,266

22,340

Miles.

Bridges

18,279

15,588

8,880

Main line

8:22

Sidings-Un Long

1

Bank protection

11,593

7,406

+

Total permanent way

9.22

Permanent-way

31;744

28,897

28,406

Stations

...

13,953

9,000

4,744

9-22 Miles of permanent way at $25,000

$230,500

Administration

4,651

4,000

3,895

6 Sets of points and crossings at $500 ...

3,000

Compensation

465

500

486

$233,500

Contingencies

10,000

10,000

4,866

Total cost per mile

D

207,990

140,122

88,564

Station.

Un Long-Station building

$6,000

41366

Platform

5,000

>>

No. 172.

Platform cover

4,000

11

Goods shed

8,000

Water tank

3,000

11

"

Signalling

6,000

Telegraph

4,000

22

Station appliances

3,000

(Confidential.)

SIR,

$39,000

FOREIGN OFFICE to COLONIAL OFFICE.

(Received November 21, 1905.)

[Answered by No. 175.]

Foreign Office, November 20, 1905. WITH reference to previous correspondence respecting the Hankow-Canton Railway Concession, I am directed by the Marquess of Lansdowne to state, for the information of the Secretary of State for the Colonies, that on the 5th instant the

18885

SKI

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.