$10,800 1,080,000
738,000
400
4,000
$1,833,200
256
I have endeavoured in the above to avoid as much as possible an encroachment on that report, but, turn which way I will, I find myself confronted with 'something that has been said before, and am obliged, therefore, to admit that, as far as the trade of the New Territory, both existing and prospective, is concerned, I have no reliable information to lay before Your Excellency beyond that which Your Excellency already possesses.
Finally, what I have said as to the comparative merits of Railways Nos. 1 and 2 (for surely Route (A) is dead) may thus be summarised and written :—
Cost of construction.-Railway 1 - Railway 2 $293,650. Working expenses (including maintenance).-Railway 1 Railway 2
$1,716,084.
Time required for construction.-Railway 1 Railway 2 Anticipated traffic per annum - $376,250.
=
-
257
Cost of Tunnel, 2,400 yards long. Lined throughout with Brick in Cement.
Mining earth and boulders, 45 square yards × 60 = 2,700 cubic yards
at $4 Mining rock, 45 square yards × 2,400 108,000 cubic yards at $10 Lining of brick in cement, 12 square yards × 2,460- 29,520 cubic yards
--
at $25 Two faces, 2 x 100 cubic yards excavation - 200 cubic yards at $2 Two faces, 2 × 200 cubic yards masonry 400 cubic yards at $10
=
Or $749 per linear yard.
E
24 years.
I have, &c.,
J. C. BRUCE, B.A., C.E.,
Chief Surveying Engineer,
Kowloon-Canton Railway,
Same as above, but Roof lined only.
Mining earth and boulders, 36 square yards × 60 = 2,160 cubic yards
British Section.
To His Excellency
The Governor of Hong Kong,
...
Major Sir Matthew Nathan, R.E., K.C.M.G.
at $4 Mining rock, 36 square yards × 2,400 - 86,400 cubic yards at $10 Lining of brick in cement, 3 square yards × 2,460 – 7,880 cubic yards
at $25 Two faces, as above
$8,640 884,000
194,500
4,400
$1,071,540
Main line
Sidings:-
Kowloon Shatin Tai Po
Fan Ling
Lo Fu
RAILWAY NO. 1.
Permanent Way.
Miles.
21.5
2
0:5
1
I
0.5
1
5
Main line Sidings
Kowloon Tsin Wau
San Hue
Un Long
Lo Fu
Or $435 per linear yard.
RAILWAY No. 2. Permanent Way.
Total permanent way
26.5
Total permanent way
26.5 Miles of permanent way at $25,000
$662,500
40 Sets of points and crossings at $500
20,000
38.5 Miles of permanent way at $25,000 40 Sets of points and crossings at $500 .....
$682,500
Miles.
34
2
0.5
0:5
1
0.5
4.5
88.5
$962,500
20,000
$982,500
Stations.
4 Station buildings at $6,000
Stations.
$24,000
4 Station platform covers at $4,000
16,000
4 Station buildings at $6,000
$24,000
4 Station platforms at $5,000
20,000
4 Station platform covers at $4,000
16,000
4 Goods sheds at $8,000
32,000
4 Station platforms at $5,000
20,000
5 Water tanks at $5,000
25,000
4 Goods sheds at $8,000
32,000
2 Running sheds at $12,000
24,000
5 Water tanks at $5,000
25,000
2 Turntables at $8,000
16,000
2 Running sheds at $12,000
24,000
Signalling
15,000
2 Turntables at $8,000
16,000
Telegraph at $500 per mile
11,000
Signalling
15,000
Tools and appliances
7,000
Telegraph at $500 per mile
17,000
Repair shops
10,000
Tools and appliances
7,000
Kowloon Station
100,000
Repair shops
10,000
Kowloon Station
100,000
$300,000
$306,000
18885
PUBLIC RECORD OFFICE
ساسانيا
Reference :-
C.O. 882
6
ALLY WITHOUT PERMISSION OF THE BE REPRODUCED PHOTOGRAPHIC-
COPYRIGHT PHOTOGRAPH-NOT TO
PUBLIC RECORD OFFICE, LONDON
258
Cost of Tunnel, 750 yards long.
Peg 28,130 to Peg 30,880.