Would it make it a hydraulic conerata •
15.198
A.
Partly. It would not be so good as using cament.
99
Q.
What would you call a good specification for a lime 15749
concrete floor, but using a certain percentage of
A.
cement ?
I should say one of lime, one of cement, and two of
red earth, and four to five of stone.
157207
200
What sized stone would you use ? -The Maximium
through what mesh ?
-
15200
A.
A one inch ring.
Have you worked out the cost of lime conorete per yard
%
PUBLIC RECORD OFFICE
لسلسا
Reference:-
C.O. 537
•
A.
I have very great difficulty in getting the proper
price of Chinese labour. I have never really know what
it is. The pay sheets have not come under my notice.
Therefore you are not able to may what, is the
comparative cost of cement floors or concrete ?
15202
A.
Not as regards labour.
15203
05 9.
Now would you condemn a floor which has been laid with
six inches of lime concrete, and the cement rendering
on the top was good, if you merely found in some
corners or round the hides evidences of ratholes ?
A.
No, I certainly would not condemn it.
oy Q.
Would you go so far as to recommend the Board, if you
were the responsible officer, to have that floor dug
1.204
up to search for any uefects.
<&
A.
*
A.
Not on the point of finding one or two rat holes.
I am not showing of ratholes. What action would you
take, or recommend that the Board should take, if you
just found the rat holes ?
I would carefully examine the floor, and if I found no
atller defects, except the rat holes, I should say
make good the rat holes.