Applicados.
Power of
Covernor to
give directÃO DE
10 Director.
Applically
of Code of Pracuse.
Stam of kataladid.
MAM CLC.
Information K to method of
solid,
Installation Ot to commCACE until pla etc. approved.
2
"installation worka" means all works relating to the installation of an aerial ropeway, other than building works relating to the construction of any buildings or structures connected therewith,
1.
(1) Subject to subsection (2), this Ordinance, other than Part II, shall apply to any aerial ropeway in existence before the commencement of this Ordinance.
(2) Aay regulations made under section 28 may be expressed to apply to any serial ropeway in existence at the time of commencement of ibis Ordinance.
I
(3) This Ordinance shall not apply to any temporary aerial ropeway for use solely 10 carry materials for the construction of any building or structure.
4. (1) The Governor may give to the Director such directions as be thinks fl with respect to the exercise or performance of his powers, functions and duties "under this Ordianoce, Either generally or in any particular case,
(2) The Director shall, in the exercise or performance of his powers, functions and duties under this Ordinance, comply with any direction given by the Governor under subsection (1).
PART II
INSTALLATION OF ABHIAL Ropeways
$. The Director may, by notice in the Gazette, prescribe a Code of Practice, which shail, subject to this Ordinance, govern the design, manu- facture, and installation of aerial ropewaye
6. A person wishing to install an aerial ropeway shall not commence any installation works before a date determined by the Director.
7. A person wishing to install an aerial ropeway shall submit to the Director-
(a) a plan, in duplicate and on such scale as the Director may
specify, showing the proposed route of the ropeway; and
(6) the designs and specifications of the machinery, equipment and
plant relating to the ropeway,
together with such other information, plans, specifications or calculations as may be required by the Director.
* All plans. designs, specifications and calculations submitted to the Director under section 7 shall be accompanied by information as to the proposed method of installation of the aerial ropeway and the proposed programme of installation.
9. (1) The person wishing to install an aerial ropeway shall not commence any part of the installation works until the plans, designs, specifications, calculations and the method and programme of installation have been approved by the Director,
(2) Any approval by the Director under subsection (1) may be limited to any stage in the installation of the aerial ropeway,
3
in accordance
10. (1) The installation works shall be carried out in accordance Amal ropekay with the plans, designs, specifications, calculations and method and pro- 19 bestalled grumme of installation as approved under section 9, subject to such with pleas, c. modifications as may be made thereto from time to time by the person installing the ropeway with the prior written approval of the Director.
(2) I, in respect of any part of the installation works the Director is of the opinion thal-
(a) there is any departure from the requirements or subsection (1); (5) the method of installation is unsafe; or
(c) the installation works have been or are being carried out in
contravention of this Ordinance or the Code,
he may direct the person installing the serial ropeway to discontinue any such part and the same shall not be continued until the Director is satisfied that any further installation works comply with such requirements or that the method of installation will be safe, as the case may be.
(3) If a direction under subsection (2) is not complied with. the Director may carry out such works as he thinks fit to ensure that the installation works comply with the requirements of subsection (1) or that the method of installation will be safe, as the case may be.
(4) The cost of works carried out under subsection (3) shall be recoverable as a debt to the Crown from the person installing the merial topkway.
11. Save with the written approval of the Director, no part of an Prohibition da
PRASANG OVER aerial ropeway shall pass over any building.
buds.
(2 (1) During the installation works the person installing the aerial barrection. ropeway shall ensure that such works do not cause undue obstruction of any road, shipping. channel or railway or cause any hazard to air naviga- tion.
(2) If the Director is of the opinion that any part of the installation works is obstructing any road, shipping, channel or railway or is causing a hazard to air aavigation he may direct the person installing the acrial ropeway to discontinue such works, and such works shall not be con- tinued except with the permission of the Director and subject to such conditions as he may impose.
13. (1) The Director or any public officer authorized by him in Power 10 writing, may at any time enter the place at which an aerial ropeway is enter and being installed--
(a) to ascertain whether the person installing the aerial ropeway is complying with the provisions of this Ordinance and the Code relating to the installation of the aerial ropeway;
(6) to ascertain whether the installation works are dangerous or liable to become dangerous to persons using, or employed in connexion with, the aerial ropeway; and
(c) to inspect and test any machinery, equipment or plant to be
used in coonexion with such serial ropeway.
(2) The person installing an aerial ropeway shall afford the Director such facilities as he may reasonably require for the purposes of subsec- tion ()
14. Neither the approval of plans, specifications, calculations and the method and programme of installation under section 9 nor the approval of commencement of operation under section 16 sball-
inspec
Approval of plana etc. not
To confer dole