- 16.
The final reports and executive summaries of completed EIAs are available for inspection at the EPD Library, 40th floor, Revenue Tower, Wan Chai, Hong Kong.
Others that are likely to be completed in the next 12 months include:
1.
Main Drainage Channel for Fanling, Sheung Shui and Hinterland (Civil Engineering Department)
2.
Route 16: From West Kowloon to Sha Tin
(Highways Department)
3.
Sham Tseng Link Feasibility Study
4.
(Highways Department)
Sand Extraction and Backfilling of Eastern Waters Marine Borrow Areas
(Civil Engineering Department)
5.
Central Reclamation, Phase III
(Territory Development Department)
6.
MTR Tseung Kwan O and Quarry Bay Extensions (Mass Transit Railway Corporation)
7.
KCR Hung Hom Extension cum Ma On Shan Rail Link (Highways Department)
8.
Aviation Fuel Pipeline
(Airport Authority)
9.
10.
11.
12.
Central/Wan Chai Bypass and Island Eastern Corridor Link (Highways Department)
Backfilling of Marine Borrow Area at East Tung Lung Chau
(Civil Engineering Department)
Tsuen Wan Bay Further Reclamation
(Territory Development Department)
Feasibility Study for Castle Peak Road Improvement between Ka Loon
Tsuen and Tsuen Wan
(Highways Department)