-

25

Prequalification exercise for runway monitor tower

The Architectural Services Department (Arch SD) is inviting approved contractors to participate in a prequalification exercise for the construction of a precision runway monitor tower and back-up air traffic control (ATC) facilities at the new airport in Chek Lap Kok.

The project comprises the construction of a five-level monitor tower built on top of a four-level back-up ATC complex to accommodate the precision runway monitor system, the back-up ATC Centre and back-up communication centre as well as all necessary equipment for various government departments.

Those on the Approved Contractors for Public Works List I in Group C for Building Works (confirmed) or on the List II for Building Works (confirmed) are invited to apply for pre-qualification documents from Chief Architect/1, Arch SD, Queensway Government Offices, 66 Queensway, Hong Kong.

Completed applications should be submitted as directed not later than noon on December 27,1996.

End

Tenders for public sewerage facilities in Sai Kung invited

The Drainage Services Department is inviting tenders for the laying of sewers and rising mains and construction of six sewage pumping stations in Sai Kung.

Public sewerage facilities will be built in the areas of Silverstrand, Tai Wan and Sha Ha to improve the sanitary condition of the existing unsewered areas and the water quality of Port Shelter.

The project will involve the laying of about 6,500 metres long sewers with diameters ranging from 150 to 450 millimetres, and about 2,100 metres long rising mains with diameters ranging from 100 millimetres to 300 millimetres.

Six sewage pumping stations will also be built. They are Tai Wan Pumping Station, Ngan Yan Road Pumping Station, Silver Star Path Pumping Station, Silver Cape Road Pumping Station, Sapphire Path Intermediate Pumping Station and Pik Sha Road Pumping Station.

Share This Page