44 -

Table 1 : Major consultancy studies conducted since 1993

Study

Start/ Completion

Terms of Reference

Dates

Hong

Kong Jan 1993

Island

West to

Development

late 1995

Statement

Jun 1993

Wanchai

Reclamation

to

Phase I

Nov 1993

Green Island Aug 1993

Public Dump

to

Sep 1995

Pak Shek Kok Sep 1993 Reclamation

Lantau

to

Apr 1994

Port Jan 1995 Development to

Stage 1 - Design Dec 1995

of Reclamation

for Container

Terminals 10. &

11 & Back-up

Areas

Costs

($/M)

planning 4.9

Formulate overall framework, urban renewal framework and land use sectoral action plan and, examine the institutional arrangements and resource implications for implementation of the proposal in various sections of Hong Kong Island

Study the viability of, and 3.5 determine the extent and amount

of infrastructure and associated cost for the reclamation

Assess the environmental and 5.5 traffic impacts

Assess the environmental impact 2.3 and road access

Study the detailed engineering | 22.0 design of the reclamation and edge structures for the container terminals