41

Container Terminal No. 9

-

engineering works for back-up area and infrastructure

WEDNESDAY, NOVEMBER 9, 1994

4

Annex

Approved Project

Expenditure Incurred

Estimate (APE)

Up-to-date

$2710M

$3M

(see note 1)

350CL

South East Tsing Yi port development. Planning and engineering feasibility study for Container Terminal No. 9

$17M

$17M

29TT

Duplicate Tsing Yi South Bridge

$785M

$14.7M (see note 2)

30TT

Duplicate Tsing Yi South Bridge - consultants fee for design and site

investigation

$24M

$23M

Notes

1)

TOTAL

$3536M

$57.7

S3M spent for the ENPO consultancy study

2) $14.7M incurred for the interface work between DTYSB and Route 3

/42

Share This Page