41
Container Terminal No. 9
-
engineering works for back-up area and infrastructure
WEDNESDAY, NOVEMBER 9, 1994
4
Annex
Approved Project
Expenditure Incurred
Estimate (APE)
Up-to-date
$2710M
$3M
(see note 1)
350CL
South East Tsing Yi port development. Planning and engineering feasibility study for Container Terminal No. 9
$17M
$17M
29TT
Duplicate Tsing Yi South Bridge
$785M
$14.7M (see note 2)
30TT
Duplicate Tsing Yi South Bridge - consultants fee for design and site
investigation
$24M
$23M
Notes
1)
TOTAL
$3536M
$57.7
S3M spent for the ENPO consultancy study
2) $14.7M incurred for the interface work between DTYSB and Route 3
/42