29

FRIDAY, JUNE 24, 1994

ROAD NORTH,

ITS

THE SWIMMING POOL COMPLEX, TO BE BUILT AT TEXACO WILL HAVE A DIVING POOL AND A SPECTATOR STAND FOR 1,000 PEOPLE IN INDOOR SWIMMING POOL COMPLEX.

POOL,

ITS OUTDOOR COMPLEX WILL HAVE A TEACHING POOL, A LEISURE A TRAINING POOL, WATER SLIDES, WATER PLAY EQUIPMENT, SUNBATH AREAS AND ARTIFICIAL ROCKSCAPPED DECK AREAS.

PROJECT THIS

AND

THE CONSTRUCTION

OF A

THREE-STOREY

FIRE COMPLETION IN

STATION IN PENG CHAU WILL BOTH START THIS AUTUMN FOR MARCH 1996.

REPROVISIONING THE

HAND,

PROJECT, ON THE OTHER

INVOLVES AS WELL AND

PIER

AS ALTERING

BUILDINGS EXTENDING TWO EXISTING CONSTRUCTING A SINGLE-STOREY ANCILLARY BUILDING AND A FOUR-STOREY LIFT TOWER IN THE MARINE POLICE REGIONAL HEADQUARTERS IN SAI WAN HO.

WORKS ARE EXPECTED TO COMMENCE IN SEPTEMBER FOR COMPLETION THE END OF NEXT YEAR.

BY

THE

TENDER FORMS AND FURTHER PARTICULARS CAN BE OBTAINED FROM

GOVERNMENT QUEENSWAY ARCHITECTURAL SERVICES DEPARTMENT, 34TH FLOOR, OFFICES, 66 QUEENSWAY, HONG KONG.

TENDER OFFERS FOR THE THREE PROJECTS WILL CLOSE NEXT MONTH.

-

A

SAFETY PRECAUTIONS DURING BAD WEATHER URGED * * * * *

LABOUR

DEPARTMENT'S SPOKESMAN

URGED SITE (FRIDAY) TODAY

WORKS THAT MIGHT BE PERSONNEL ΤΟ TAKE PRECAUTIONARY MEASURES ON

SIGNAL "RED" AFFECTED DURING TYPHOONS OR WHEN THE RAINSTORM WARNING WAS ABOUT TO BE HOISTED.

"CRANES SHOULD NOT BE USED WHEN THE WEATHER CONDITION IS LIKELY PROPER STACKING OF TO ENDANGER ITS STABILITY. GOOD HOUSE KEEPING,

AND MATERIALS,

PROTECTION OF ELECTRICAL SUITABLE EQUIPMENTS ARE ALSO NECESSARY DURING BAD WEATHER,

11

INSTALLATIONS HE SAID.

AND SCAFFOLDS LASHING OR

"IN ADDITION, STABILITY OF LIFTING APPLIANCES SHOULD BE FURTHER STRENGTHENED BY WALL-TIES, BALLASTING, GUY ROPES.

17

PROVIDE ADVICE ON SAFETY HE ALSO URGED SITE PERSONNEL TO MEASURES TO WORKERS WHO WERE REQUIRED TO WORK AT HEIGHT.

AND NOTING THAT THE STABILITY OF LIFTING APPLIANCES, SCAFFOLDS

EXPOSURE TO ADVERSE WEATHER AFFECTED AFTER EXCAVATIONS MIGHT BE

TO ASSIGN COMPETENT CONDITIONS, THE

ASKED CONTRACTORS SPOKESMAN

WERE TO ENSURE THAT THEY PERSONS TO RE-EXAMINE THESE AREAS OF WORK STABLE, SECURE AND SAFE.

/UNDER THE

Share This Page