33
FRIDAY, APRIL 29, 1994
THE PLAN AND SCHEDULE SHOWING THE PROPOSED WORKS DURING OFFICE HOURS AT:
CAN BE SEEN
THE CENTRAL WESTERN
* THE PUBLIC ENQUIRIES SERVICE CENTRE OF
DISTRICT OFFICE, GROUND FLOOR, HARBOUR BUILDING, 38 PIER ROAD, CENTRAL, HONG KONG; AND
PO
DISTRICT BUILDING, TING KOK ROAD,
* THE TAI PO DISTRICT
LANDS
OFFICE
AND THE TAI
OFFICE, TAI PO GOVERNMENT OFFICE TAI PO.
MEANWHILE, THE DEPARTMENT
HAS ALSO PROPOSED, IN CONNECTION WITH THE VILLAGE FLOOD PROTECTION WORKS FOR SHA PO TSUEN IN YUEN LONG, CONSTRUCTING NEW ROADS FOR LOCAL ACCESS AND MAINTENANCE PURPOSES.
FACILITATE THE
SOME EXISTING TRACKS WILL HAVE TO BE CLOSED TO WORKS BUT PEDESTRIAN AND VEHICULAR ACCESS WILL BE MAINTAINED.
DETAILS GAZETTE TODAY.
OF THE
PROPOSAL WERE
PUBLISHED
IN THE GOVERNMENT
PRE-QUALIFICATION SUBMISSIONS INVITED FOR OUTFALL TUNNEL WORKS
* *
PRE-QUALIFICATION
STAGE 1 OF THE STRATEGIC
THE DRAINAGE SERVICES DEPARTMENT IS INVITING SUBMISSIONS FOR A WORKS CONTRACT FOR THE SEWAGE DISPOSAL SCHEME.
THE CONTRACT COMPRISES DESIGN,
AND CONSTRUCTION YEARS OF ABOUT TWO
AN OUTFALL TUNNEL OVER A PERIOD OF 1,800-METRE LONG AND FIVE METRES IN DIAMETER.
COMMISSIONING MEASURING
DRILLING AND
OF A 1,200-METRE DIFFUSER BLOCKS AND WORKS ON
IT ALSO INCLUDES ASSOCIATED MARINE DREDGING WORK, INSTALLATION OF VERTICAL RISER PIPES, CONSTRUCTION LONG AND 3.2 METRES IN DIAMETER SEABED PIPELINE, ENTRY CULVERT CONNECTION FROM THE PROPOSED SEWAGE TREATMENT STONECUTTERS ISLAND.
A NOTICE INVITING PRE-QUALIFICATION
SUBMISSIONS WAS GAZETTED
TODAY (FRIDAY).
ONLY CONTRACTORS
TUNNELLING
WITH
AND
RESOURCES
TUNNEL BORING
APPLY
FINANCIAL.
AND DRILLING,
INVITED
TO
SUFFICIENT EXPERIENCE IN MARINE CONSTRUCTION AND MACHINE
ARE IN HARD ROCK PRE-QUALIFICATION DOCUMENTS FROM THE PROJECTS WATSONS HONG KONG LIMITED, 1911 WINDSOR HOUSE, CAUSEWAY BAY.
THE CLOSING DATE FOR DOCUMENTS IS NOON ON JUNE 1.
FOR
CONSULTANT, MONTGOMERY 311 GLOUCESTER ROAD,
THE
SUBMISSION
OF
PRE-QUALIFICATION
/34