SUPPLIERS OF SEWAGE PUMPING EQUIPMENT WANTED

THE DRAINAGE SERVICES DEPARTMENT IS INVITING PREQUALIFICATION SUBMISSIONS FOR THE SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ELECTRICAL AND MECHANICAL EQUIPMENT FOR FOUR SEWAGE PUMPING STATIONS.

THEY ARE THE STONECUTTERS ISLAND MAIN PUMPING STATION, TSEUNG KWAN 0 PUMPING STATION, NORTHWEST KOWLOON PUMPING STATION AND KWUN TONG PUMPING STATION.

THE PROJECT FORMS PART OF STAGE I OF THE STRATEGIC SEWAGE DISPOSAL SCHEME TO COLLECT AND TREAT SEWAGE FROM KOWLOON BETWEEN TSUEN WAN AND TSEUNG KWAN O AND FROM THE NORTHEASTERN PART OF HONG KONG ISLAND.

A NOTICE INVITING PREQUALIFICATION SUBMISSIONS WAS GAZETTED TODAY (FRIDAY).

ONLY CONTRACTORS WITH EXPERIENCE IN ERECTING SEWAGE OR RAW WATER PUMPING PLANT OF CAPACITY EXCEEDING 20 CUBIC METRES PER SECOND ARE INVITED TO APPLY FOR PREQUALIFICATION DOCUMENTS FROM THE PROJECT'S CONSULTANT, MONTGOMERY WATSON HONG KONG LIMITED, 1911 WINDSOR HOUSE, 311 GLOUCESTER ROAD, CAUSEWAY BAY.

THE APPLICATIONS SHOULD BE RETURNED TO THE CONSULTANT NO LATER THAN NOON ON APRIL 22.

THE DEPARTMENT WILL INVITE TENDERS FROM THE PREQUALIFIED CONTRACTORS LATER THIS YEAR.

FORMATION OF PO LAM ROAD PLATFORM

TENDERS WILL BE INVITED IN JUNE FROM PREQUALIFIED CONTRACTORS

BE FOR THE FORMATION OF PO LAM ROAD PLATFORM AT SAU MAU PING TO FOR A PUBLIC HOUSING DEVELOPMENT.

USED

AND LUMP

SUM

JUNCTION BETWEEN PO

LAM

THE PROPOSED PROJECT WILL BE A DESIGN-AND-BUILD CONTRACT. IT IS LOCATED TO THE EAST OF THE ROAD AND SAU MAU PING ROAD.

AS FROM TODAY (FRIDAY), WITH THE PUBLICATION THE GAZETTE, APPLICATIONS FOR THE PREQUALIFICATION THE CONTRACT ARE INVITED UNTIL MAY 13, 1994.

OF A

OF

NOTICE TENDERERS

IN

FOR

OF

A PLATFORM

WITH

AN:

THE CONTRACT CALLS FOR THE FORMATION AREA OF ABOUT 6.5 HECTARES AND THE DIVERSION OF A 600 MM DIAMETER SALT WATER MAIN AWAY FROM THE SITE.

SOIL AND ROCK, CUTTING AND FILLING

BULK

THE MAJOR CONSTRUCTION WORKS WILL INVOLVE

EXCAVATION IN OF

SLOPES,

OF IMPROVEMENT

THE OF STABILITY OF EXISTING SLOPES, CONSTRUCTION OF ACCESS ROADS, LAYING A SALT WATER MAIN AND INSTALLATION OF STORM WATER DRAINS. CONSTRUCTION OF RETAINING WALLS MAY ALSO BE REQUIRED.