FRIDAY, JANUARY 21, 1994
18
IMPROVEMENT WORKS FOR LUNG CHEUNG AND CHING CHEUNG ROADS
*
THE GOVERNOR IN COUNCIL HAS AUTHORISED IMPROVEMENT WORKS FOR THE EXISTING LUNG CHEUNG ROAD AND CHING CHEUNG ROAD.
THE OBJECTIVES OF THE WORKS ARE TO IMPROVE VEHICULAR TRAFFIC CONDITIONS AND TO INCREASE THE TRAFFIC CAPACITY ALONG LUNG CHEUNG ROAD AND CHING CHEUNG ROAD WHICH FORM ONE OF THE MOST IMPORTANT EAST AND WEST LINKS ALONG THE KOWLOON PENINSULAR.
ABOUT FIVE KILOMETRES OF ROAD STRETCHING FROM BUTTERFLY VALLEY IN THE WEST TO LION ROCK TUNNEL IN THE EAST ARE
то BE WIDENED FROM DUAL TWO-LANE TO DUAL THREE-LANE.
FROM TAI PO ROAD INTERCHANGE TO BEACON HEIGHTS, WHERE WIDENING IS NOT ACHIEVED BECAUSE OF SITE CONSTRAINTS, A ONE-KILÒMETRE LONG ELEVATED ROAD OFF LUNG CHEUNG ROAD MAINLINE WILL BE BUILT.
THE ENTIRE PROJECT IS EXPECTED TO START IN MID-1994 BE COMPLETED BY MID-1997.
AND WILL
A NOTICE ABOUT THE PROPOSED WORKS IS GAZETTED TODAY (FRIDAY).
PLANS SHOWING THE ROAD WORK PROJECT CAN BE SEEN AT:
* THE CENTRAL AND WESTERN DISTRICT OFFICE, PUBLIC ENQUIRY SERVICE CENTRE, GROUND FLOOR, HARBOUR BUILDING, 38 PIER ROAD, CENTRAL, HONG KONG;
*
THE DISTRICT LANDS OFFICE/KOWLOON WEST AND THE DISTRICT LANDS OFFICE/KOWLOON EAST, BOTH AT YAU MA ΤΕΙ CAR PARK BUILDING, 10TH FLOOR, 250 SHANGHAI STREET, KOWLOON;
THE DISTRICT LANDS OFFICE/KWAI TSING, 10TH FLOOR, TSUEN WAN STATION MULTI-STOREY CARPARK BUILDING, 174-208 CASTLE PEAK ROAD, TSUEN WAN, NEW TERRITORIES;
THE SHAM SHUI PO DISTRICT OFFICE, SIXTH FLOOR, 290 UN CHAU STREET, SHAM SHUI PO, KOWLOON;
*
THE KOWLOON CITY DISTRICT OFFICE, 141-143 KAU PUI LUNG ROAD, FIRST FLOOR, KOWLOON AND THE KWAI TSING DISTRICT OFFICE, 10TH FLOOR, KWAI HING GOVERNMENT OFFICES BUILDING, HING FONG ROAD, KWAI CHUNG, NEW TERRITORIES.
166-174
/19
Page 20Page 21