TUESDAY, NOVEMBER 16, 1993

3.WAI KEY

HUNG TO

KNITTING CO

RD.

15.2.93- 19.3.93

APCO :

UNAUTHORISED

1,000 1ST

KWUN TONG

LTI

KWUN TONG

INSTALLATION

OR ALTERATION

OF FURNACES

4.CHUN WO

SEYMOUR

AND

ENGINEERING

CO LTD

5.NIP CHI-

TAK

14.3.93

NCO :

5,000 1ST

WESTERN

CONSTRUCTION TERRACE,

CARRY OUT

MID-LEVELS

CONSTRUCTION

WORK WITHOUT A

VALID PERMIT

14.3.93

NCO :

5,000 1ST

WESTERN

PERMIT CONSTRUCTION

WORK WITHOUT A

VALID PERMIT

6. HOPEWELL

BROADWOOD 14.3.93

NCO :

3,000 1ST

EASTERN

CONSTRUCTION RD,

CARRY OUT

CO LTD

HAPPY VALLEY

CONSTRUCTION WORK

WITHOUT A VALID

PERMIT

7.TSANG WA-

CHIU

14.3.93

NCO:

500

1ST

EASTERN

PERMIT

CONSTRUCTION

WORK WITHOUT

A VALID PERMIT

8. LEUNG YIU- MA ON

16.3.93

NCO :

4,000 1ST

SHATIN

KWONG

TERRACE, MA ON SHAN

OWN PRODUCTS DID

NOT COMPLY

WITH THE

REQUIREMENT OF

SECTION 17(1)

9.CHAN CHI-

TIN HAU

18.3.93

WPCO:

10,000 1ST

KUEN AS

SUN PAK YAN

RD, TUEN MUN

DISCHARGED

TUEN MUN

POLLUTING MATTER

FOOD SHOP

IN NORTH WESTERN

10.HOP SHING PATERSON TRANSPORT & RD,

19.3.93

CONSTRUCTION CAUSEWAY

CO

BAY

WATER CONTROL

ZONE

APCO:

CONTRAVENING

TERMS OR

CONDITIONS OF

A SPECIFIED

PROCESS LICENCE

11. EVERY ON

LTD

- MAIN

CONTRACTOR

TSING LUNG 24.3. 93 TAU

DASO :

PERMIT DUMPING

OF ABOUT 1,000 POUNDS OF

METALLIC SAND AT SEA NORTH

OF TSING YJ

WITHOUT DUMPING

LICENCE

4,000 1ST

FANLING

3,000 1ST

EASTERN

/12.KEI HING

Page 10Page 11

Share This Page