12
FRIDAY, MARCH 26, 1993
ARE
OBTAINABLE
FROM
KONG
THE
LIMITED,
DOCUMENTS PREQUALIFICATION DEPARTMENT'S CONSULTING ENGINEERS, MOTT MACDONALD HONG 12TH FLOOR, SUN HUNG KAI CENTRE, 30 HARBOUR ROAD, WAN CHAI, HONG KONG.
то SUBMITTED APPLICATIONS FOR PREQUALIFICATION SHOULD BE DIRECTOR OF HIGHWAYS ON OR BEFORE NOON ON APRIL 23 (FRIDAY).
THE
-
SERVICES CONTRACT FOR CHEUNG CHING TUNNEL
INVITING APPLICATIONS
FROM
THE HIGHWAYS DEPARTMENT IS CONTRACTORS TO PREQUALIFY FOR TENDERING FOR THE ROUTE 3 CHEUNG CHING TUNNEL TUNNEL SERVICES CONTRACT.
-
A SPOKESMAN FOR THE DEPARTMENT SAID THE CONTRACT INVOLVED THE DESIGN, MANUFACTURE, INSTALLATION, TESTING AND COMMISSIONING OF THE ELECTRICAL AND MECHANICAL FACILITIES FOR THE CHEUNG CHING TUNNEL TO BE BUILT ON TSING YI ISLAND.
THE ELECTRICAL AND MECHANICAL FACILITIES INCLUDE THE POWER SUPPLY SYSTEM, TUNNEL LIGHTING SYSTEM, FIRE PROTECTION SYSTEM AND BUILDING SERVICES, HE SAID.
A NOTICE DETAILING THE
GAZETTED TODAY (FRIDAY).
PREQUALIFICATION EXERCISE WAS
PREQUALIFICATION DOCUMENTS CAN
SCOTT WILSON KIRKPATRICK AND PARTNERS,
BE OBTAINED FROM SPHW, C/0 38TH FLOOR METROPLAZA TOWER 1. 223 HING FONG ROAD, KWAI FONG, NEW TERRITORIES, HONG KONG.
MAY 14.
COMPLETED DOCUMENTS SHOULD BE RETURNED NOT LATER THAN NOON ON
TENDERS FROM PREQUALIFIED CONTRACTORS ARE EXPECTED TO INVITED IN JULY OR AUGUST THIS YEAR.
BE
TWO WATER WORKS PROJECTS ON LANTAŲ
THE WATER SUPPLIES DEPARTMENT IS INVITING APPROVED CONTRACTORS TO PARTICIPATE IN PREQUALIFICATION EXERCISES FOR TWO WATER WORKS
PROJECTS.
ONE OF THESE INVOLVES THE SUPPLY AND INSTALLATION OF EIGHT KILOMETRES OF LAND AND SUBMARINE RAW WATER STEEL MAINS WITH A DIAMETER OF 1,800 MILLIMETRES FROM TAI LAM CHUNG RESERVOIR TO TA PANG PO ON THE NORTHERN COAST OF LANTAU ISLAND.
/THOSE ON