FRIDAY, OCTOBER 9, 1992
33
SEWERAGE MASTER PLAN STUDY COMMISSIONED
*
COMMISSIONED
RESULTING FROM EFFLUENT TO AND POK
THE ENVIRONMENTAL PROTECTION DEPARTMENT (EPD) HAS A STUDY TO ASSESS THE EXTENT OF THE POLLUTION PROBLEM THE IMPROPER DISCHARGE OF DOMESTIC SEWAGE AND INDUSTRIAL STORMWATER DRAINS AND WATER COURSES IN ABERDEEN, AP LEI CHAU FU LAM.
(FRIDAY) BETWEEN THE AGREEMENT FOR THE STUDY WAS SIGNED TODAY
MR MIKE STOKOE AND EPD'S ASSISTANT DIRECTOR (WASTE AND WATER POLICY),
PYPUN-HOWARD HUMPHREYS LIMITED, THE MANAGING DIRECTOR OF THE
MR D
IVOR-SMITH.
ADEQUACY AND AN EPD SPOKESMAN SAID THE STUDY WOULD ASSESS THE PERFORMANCE OF THE EXISTING SEWERAGE SYSTEMS AND BASED ON THE RESULTS, FORMULATED TO ENSURE THAT ALL SCHEMES FOR REMEDIAL WORKS WOULD BE
AND
OF IN DISPOSED
AN SEWAGE
COLLECTED PROPERLY ENVIRONMENTALLY ACCEPTABLE MANNER.
WOULD
'BE
WILL BE PLAN
DEVELOPED AND A NECESSARY
MASTER HE SAID: "A SEWERAGE PRIORITISED PROGRAMME FOR PROGRESSIVE IMPLEMENTATION OF THE ENGINEERING WORKS WILL BE PREPARED TO PROVIDE FOR SHORT- AND LONG-TERM MEASURES TO REDUCE THE POLLUTION PROBLEMS IN STAGES.
"EMPHASIS
BE GIVEN
ΤΟ
WILL
EARLY ENVIRONMENTAL ACHIEVING
HE ADDED. IMPROVEMENTS, PARTICULARLY AT ABERDEEN TYPHOON SHELTER,
+
THE STUDY, AT A COST OF $10 MILLION, WILL TWO PHASES AND BE COMPLETED IN 21 MONTHS.
BE CARRIED OUT IN
0
TIN SHUI WAI SPORTS GROUND SURFACING WORKS
TENDERS FOR THE ARCHITECTURAL SERVICES DEPARTMENT IS INVITING
LAYING OF THE SUPPLY AND
ALL-WEATHER ATHLETIC SURFACING FOR THE SPORTS GROUND IN AREA 12, TIN SHUI WAI, YUEN LONG.
START EARLY
NEXT YEAR AND IS EXPECTED TO BE
WORKS WILL COMPLETED NEXT JUNE.
ODTAINED PROM
BE FORMS OF TENDER AND FURTHER PARTICULARS MAY DEPARTMENT'S HEADQUARTERS, 34TH FLOOR, QUEENSWAY GOVERNMENT OFFICES, 66 QUEENSWAY, HONG KONG.
THE
TENDER OFFER WILL CLOSE AT NOON ON NOVEMBER 6.
/34