1
1
FRIDAY, APRIL 10, 1992
THE
OTHER SINGLETONS AND DOUBLETONS NOT ACCEPTING CASH COMPENSATION MAY BE OFFERED SPACE IN DORMITORY ACCOMMODATION TO BE PROVIDED BY CORPORATION.
UPON
FOR COMPLETION OF THE RESUMPTION AND CLEARANCE, THE LAND
METRES, WILL BE THE PROJECT, WITH AN AREA OF ABOUT 7,000 SQUARE GRANTED BY LAND EXCHANGE TO THE CORPORATION FOR REDEVELOPMENT.
LAND TO BE RESUMED FOR TUNG CHUNG PROJECT * * * * *
THE GOVERNMENT IS TO RESUME 80 LOTS OF LAND
ON LANTAU ISLAND
TO FACILITATE THE PHASE 1 TUNG CHUNG NEW TOWN DEVELOPMENT.
DETAILS OF THE RESUMPTION WERE GAZETTED TODAY (FRIDAY).
LOCATED NEAR LAU FAU SHA ON LANTAU, THE RESUMPTION INVOLVES
OF ABOUT 25,685 SQUARE PRIVATE AGRICULTURAL LOTS WITH A TOTAL AREA METRES.
80
THE EXPIRY OF
THE LAND WILL BE REVERTED TO THE GOVERNMENT ON THREE MONTHS FROM THE DATE OF POSTING OF NOTICES ON THE LOTS.
WORKS FOR WEST KOWLOON EXPRESSWAY PROPOSED
FROM MEI FOO TO YAU MA TEI ON THE KOWLOON AS PART OF ROUTE 3.
THE HIGHWAYS DEPARTMENT PROPOSES
TO CONSTRUCT AN NEWLY RECLAIMED LAND
IN
EXPRESSWAY WESTERN
WEST
KOWLOON
EXPRESSWAY,
WITH TOGETHER
THE THE PROPOSED
CROSSING, ANOTHER PROPOSED NORTH LANTAU EXPRESSWAY, THE LANTAU FIXED
WESTERN SECTION OF ROUTE 3 FROM NORTHWEST TSING YI TO MEI FOO AND THE
THE BETWEEN
NEW ROAD LINK HARBOUR CROSSING, WILL FORM A CONTINOUS
NETWORK IN TSING YI, AIRPORT AT CHEK LAP KOK AND THE EXISTING ROAD KWAI CHUNG, KOWLOON, HONG KONG ISLAND AND NORTHWEST NEW TERRITORIES.
OF THE WORKS COMPRISE ELEVATED ROADS BETWEEN MEI FOO AND NORTH
AND SEMI-DEPRESSED ROADS TO THE CHERRY STREET AS WELL AS AT GRADE
LOCAL INTERCHANGES,
SOUTH
WITH ASSOCIATED STREET OF CHERRY DISTRIBUTOR ROADS, JUNCTIONS AND FOOTBRIDGES.
A NOTICE OF THE PROPOSED WORKS WAS GAZETTED TODAY (FRIDAY).
/THE PLANS