FRIDAY, FEBRUARY 1, 1991
*
LAYING OF A FOUL SEWER ALONG REPULSE BAY ROAD:
LAYING OF THE PUMPING MAINS OF THE STATIONS; AND
SECONDARY
PUMPING
* LAYING OF A PUMPING MAIN FROM REPULSE BAY TO WONG CHUK HANG.
THE CONTRACT WILL ALSO COVER THE LAYING OF A FRESH WATER MAIN ALONGSIDE THE PROPOSED PUMPING MAIN AT DEEP WATER BAY GOLF CLUB.
IN MAY.
THE CONTRACT PERIOD IS 24 MONTHS AND WORK IS EXPECTED TO START
THE WORKS FORM PART OF SHEK O AND REPULSE BAY AREAS SEWERAGE
THE AND SEWAGE DISPOSAL SCHEME WHICH WILL IMPROVE
EXISTING SEWERAGE SYSTEM AND PROVIDE TREATMENT AND DISPOSAL FACILITIES FOR SHOUSON HILL,
0 DEEP WATER BAY, MIDDLE BAY, SOUTH BAY, CHUNG HOM KOK, MA HANG, SHEK AND ROCKY BAY, SO AS TO PROTECT AND IMPROVE THE WATER QUALITY AT HONG KONG ISLAND SOUTH BATHING BEACHES.
THE DEADLINE FOR SUBMISSION OF TENDERS IS NOON ON MARCH 8.
THE
LAND RESUMPTION FOR REDEVELOPMENT AND VILLAGE RESITE
* *
*
SHARES OF THE GOVERNMENT IS TO RESUME CERTAIN UNDIVIDED LOCATED BETWEEN NOS. 187 AND 193 QUEEN'S ROAD BAST, WAN CHAI, FOR IMPLEMENTATION OF THE WAN CHAI OUTLINE ZONING PLAN.
FLOOR
UNITS
LAND
THE
AND 11 "OTHER AREA" IN THE
THE UNDIVIDED SHARES INCLUDE FOUR GROUND UPPER FLOOR DOMESTIC UNITS WHICH FALL WITHIN AN AREA ZONED FOR SPECIFIED USES" ANNOTATED "COMPREHENSIVE REDEVELOPMENT CURRENT ZONING PLAN.
UNDER THE APPROVED MASTER LAY-OUT PLAN, THE PROPERTIES BETWEEN REDEVELOPMENT REQUIRED TO MAKE WAY FOR A GOVERNMENT AND A PRIVATE DEVELOPER.
JOINT-VENTURE
ARE THE
NOS. 191
IN CONNECTION WITH THE PROJECT, A PARTY WALL BETWEEN AND 193 OF QUEEN'S ROAD BAST HAS ALSO TO BE RESUMED.
ALSO NOTIFIED TUNG
TO CHUNG AREA AT WONG LUNG
MEANWHILE, ON LANTAU ISLAND, THE GOVERNMENT HAS
PRIVATE AGRICULTURAL LOTS IN THE RESUMPTION OF 19 PROVIDE LAND FOR THE FORMATION OF VILLAGE RESITE HANG.
THE LOTS COVER A TOTAL AREA OF 3,091.6 SQUARE METRES.
DETAILS OF THE RESUMPTION WERE PUBLISHED IN THE
(FRIDAY).
GAZETTE TODAY
/4