17

-

THURSDAY, JANUARY 10, 1991

IT WAS INTENDED THAT 24-HOUR SERVICES WOULD BE PROVIDED IN SECOND HALF OF THIS YEAR.

THE

HAD A TOTAL NEAR THE

TUEN MUN HOSPITAL, WHICH COST SOME $1.2 BILLION, GROSS AREA OF 125,000 SQUARE METRES ON A 10.75-HECTARE SITE CASTLE PEAK HOSPITAL.

COMPREHENSIVE

THE HOSPITAL WAS FULLY AIR-CONDITIONED AND HAD A

AS MEDICINE, RANGE OF FACILITIES WITH ALL THE BASIC SPECIALTIES SUCH SURGERY, OBSTETRICS AND GYNAECOLOGY, ORTHOPAEDICS AND PAEDIATRICS.

UNITS SPECIALIST

PSYCHIATRY,

FOR

MENTALLY-HANDICAPPED,

AND BURNS

RENAL MEDICINE, INTENSIVE CARE, RADIOTHERAPY, PHYSICAL

THE SERVICES ΤΟ BE AVAILABLE DIALYSIS WOULD BE PART AND PARCEL OF WITHIN THE HOSPITAL.

OF SUPPORTING OCCUPATIONAL

HAD THE HOSPITAL ALSO

RANGE A COMPREHENSIVE

LAUNDRY, X-RAY, SERVICES SUCH AS CLINICAL PATHOLOGY, THERAPY, PHYSIOTHERAPY AND PROSTHETIC-ORTHOTIC SERVICES.

HEALTH CARE WAS SCHOOL TRAINING

CAPACITY FOR 195

IN ANTICIPATION OF A GREAT NEED OF NURSES IN OUR

THE FIFTH

NURSE DELIVERY SYSTEM,

GOVERNMENT ACCOMMODATED IN TUEN MUN HOSPITAL, WITH A TRAINING STUDENTS EACH YEAR.

SINGLE-STOREY

THE HOSPITAL COMPLEX COMPRISED AN 11-STOREY MAIN BLOCK, A FOUR-

BLOCK, RADIOTHERAPY

A A STOREY SPECIAL BLOCK,

TRAINING SCHOOL AND THREE-STOREY PATHOLOGY BLOCK, A 12-STOREY NURSE FIVE BLOCKS OF STAFF QUARTERS.

A SPECIAL FEATURE IN THE DESIGN OF THE HOSPITAL

WALKWAYS BY COVERED INTERLINKED THESE BLOCKS ARE TUNNELS TO ENSURE CONVENIENCE OF COMMUNICATION.

WAS THAT ALL AND UNDERGROUND

67X AND 53 THE HOSPITAL IS REACHED BY PUBLIC BUS ROUTES 67M,

MTR STATION. THE WHICH RUN FROM KOWLOON DOWNTOWN AND THE KWAI CHUNG

LONG LIGHT RAIL TRANSIT CARRIED PASSENGERS FROM THE TUEN MUN AND YUEN AREAS PRACTICALLY TO THE HOSPITAL'S MAIN ENTRANCE.

-

CONSULTANT COMMISSIONED FOR

DEVELOPMENT OF CHEMICAL WASTE TREATMENT CENTRE

THE ENVIRONMENTAL PROTECTION DEPARTMENT (EPD) HAS COMMISSIONED FOR OVERSEEING THE (ASIA) LTD TO BE THE SPECIALIST CONSULTANT DEVELOPMENT OF THE CHEMICAL WASTE TREATMENT CENTRE ON TSING YI ISLAND.

ERL

BOTH LOCAL MANAGEMENT SPECIALIST.

THE CONTRACT FOR THE DESIGN, CONSTRUCTION AND OPERATION FOR YEARS OF THE CENTRE

LAST DECEMBER TO A WAS AWARDED

AND COMPANIES

AN COMPRISING

INTERNATIONAL

15

CONSORTIUM WASTE

/A TIGHT

Share This Page