L
16
FRIDAY, OCTOBER 19, 1990
WAN PLANNING
NEARBY RESIDENTIAL
AREA
THE CHINA DYEING WORKS FACTORY, LOCATED IN TSUEN
HAS BECOME
21, DEVELOPMENTS.
INCOMPATIBLE
WITH
THE
DESIGNATION OF
FACILITATE THE PHASING
"CDA"
WOULD ACTIVITY
NOT ONLY
BUT ALSO
THE FACTORY SITE
AS OUT OF
INDUSTRIAL THIS
ENVIRONMENT IN THIS PART OF PROVIDE AN OPPORTUNITY TO ENHANCE THE TSUEN WAN, ACCORDING TO THE SPOKESMAN.
THE AREA BOUNDED BY SHA TSUI ROAD, TAI HO ROAD, AND WO TIK STREET WHICH IS STRATEGICALLY LOCATED NEAR
THE WITHIN TOWN HALL
WAN TOWN REDEVELOPMENT.
TSUEN
DESIGNATION OF THE AREA AS "CDA"
REDEVELOPMENT OF THE
COMPREHENSIVE
IS CENTRE,
YEUNG UK ROAD THE TSUEN WAN NOW RIPE FOR
WOULD PROVIDE A BASIS FOR AREA WHICH WOULD PROVIDE
SIGNIFICANT IMPROVEMENT TO THE TSUEN WAN TOWN CENTRE.
WAN OUTLINE ZONING PLAN RECENT PLANNING AND
OTHER AMENDMENTS TO THE DRAFT TSUEN RELATE MAINLY TO UPDATING OF THE PLAN WITH MORE DEVELOPMENT PROPOSALS.
AS
FOR
THE
DRAFT
KWAI
CHUNG OUTLINE AMENDMENTS INCLUDE THE REZONING OF KAU WA KENG "VILLAGE TYPE DEVELOPMENT".
ZONING
PLAN, OTHER
AREA INTO "CDA" AND
THE REZONING ALLOWS FOR COMPREHENSIVE DEVELOPMENT OF AND EXTENSION AND IMPROVEMENT OF THE KAU WA KENG VILLAGE.
THE AREA
"CDA" ZONING WILL FUTURE DEVELOPMENT PROPOSALS UNDER THE
BR PLANNING BOARD. THIS WILL SUBJECT TO PLANNING APPROVAL OF THE TOWN ENSURE PROPER REPLANNING AND REDEVELOPMENT OF THIS AREA.
A SITE AT THE JUNCTION OF CASTLE PEAK ROAD AND LEI MUK ROAD REZONED TO "OPEN SPACE" IN ORDER TO FACILITATE THE RELOCATION OF EXISTING GIRLS' HOME TO A BETTER SITE AND AT THE SAME TIME PRESERVE UNIQUE LANDSCAPE FEATURE IN THE AREA.
IS
THE
A
AND A SITE IS PROPOSED FOR RECLAMATION IN RAMBLER CHANNEL AREA
USES" ANNOTATED ZONED "OTHER SPECIFIED
"SLAUGHTERHOUSE AND ANIMAL
LANDING AREA".
A PORTION OF THE EXISTING SHEK YAM ESTATE AND SHEK TOGETHER WITH TWO SITES ARE REZONED TO "OPEN SPACE".
THE EXISTING SHEK LEI PLAYGROUND IS
(GROUP A) "
USE
REZONED
RESTRUCTURING
LEI ESTATE
"RESIDENTIAL
FOLLOWS
THIS GENERAL LAND RECOMMENDATIONS OF AN ENVIRONMENTAL IMPROVEMENT STUDY FOR THE AREA.
THE
THE MAIN OBJECTIVES ARE TO MITIGATE THE RESIDENTIAL/INDUSTRIAL INTERFACE PROBLEMS AND TO PROVIDE OPEN SPACE IN IT WILL ALSO PROVIDE A HOUSING SITE WHICH REDEVELOPMENT OF THE SHEK LEI ESTATE.
A CENTRAL WILL FACILITATE THE
LOCATION.
/OBJECTIONS TO