13

FRIDAY, SEPTEMBER 14, 1990

UNDERGROUND STRUCTURES SUBJECT TO PROPER CONTROL

UNDERGROUND STRUCTURES SUCH AS HAVE BEEN DEFINED AS A BUILDING IN GAZETTE TODAY (FRIDAY).

THE

BUILDING AUTHORITY

QUAY,

A

CAVERN AND UNDERGROUND DECLARATION

PUBLISHED IN

SPACE THE

HAS DECLARED

UNDERGROUND ANY

SEA-WALL,

SPACE

OR

BREAKWATER, ADAPTED INCLUDING ITS ASSOCIATED FOR THE PURPOSES OF

JETTY, MOLE,

CAVERN OR CONSTRUCTED FOR OCCUPATION FOR ANY PURPOSE ACCESS TUNNELS AND ACCESS SHAFTS AS A BUILDING THE BUILDINGS ORDINANCE IN THE LAWS OF HONG KONG.

AS A RESULT, THE DESIGN AND CONSTRUCTION SUBJECT

AND TO THE CONTROL

REQUIREMENTS ORDINANCE AND ITS SUBSIDIARY REGULATIONS.

ARE

OF THESE STRUCTURES OF THE BUILDINGS

BEFORE THESE STRUCTURES

ARE

CONSTRUCTED,

PLANS

HAVE

ΤΟ

BE

SUBMITTED TO THE BUILDING AUTHORITY FOR APPROVAL.

GOVERNMENT

A RECENT STUDY BY THE UNDERGROUND SPACE HAS DEMONSTRATED THE APPLICABILITY CONSTRUCTION IN HONG KONG.

ON THE

POTENTIAL USES OF OF ROCK CAVERN

ARE

TO EXPECTED

ADOPT SUCH UNDERGROUND

PRIVATE DEVELOPERS DEVELOPMENT IN THE NEAR FUTURE.

IT IS

IMPORTANT

THAT SUCH SHOULD BE SUBJECT TO PROPER CONTROL.

PRIVATE

UNDERGROUND

DEVELOPMENT

LAND RESUMPTION FOR LANDSCAPE AREA

THE GOVERNMENT IS TO RESUME LAND IN NAM PIN WAI, YUEN LONG

OF A VILLAGE

LANDSCAPE

WITH AREA

THE CONSTRUCTION PLANTATION AND TREE RINGS, AND PARKING SPACES.

THE LAND TO

BE RESUMED

FOR

FLOWER BEDS,

COMPRISES PORTIONS OF TWO PRIVATE AGRICULTURAL LOTS WITH A TOTAL AREA OF ABOUT 2,558.6 SQUARE METRES.

THE EXPIRY OF

THE LAND WILL BE REVERTED TO THE GOVERNMENT ON THREE MONTHS FROM THE DATE OF POSTING OF NOTICES ON THE LOTS.

DETAILS OF THE RESUMPTION WERE PUBLISHED IN THE

GAZETTE TODAY

(FRIDAY).

/14

Share This Page