FRIDAY, JULY 13, 1990
18
REFURBISHMENT OF SEWERAGE AND DRAINAGE SYSTEMS IN STANLEY
* * *
THE DRAINAGE SERVICES DEPARTMENT IS INVITING TENDERS FOR REFURBISHMENT OF EXISTING SEWERAGE AND DRAINAGE SYSTEMS WITHIN
STANLEY AREA.
THE
THE
THE EXISTING SEWERAGE AND DRAINAGE SYSTEMS IN THE AREA HAD BEEN INSPECTED AS PART OF THE HONG KONG ISLAND SOUTH SEWERAGE MASTER PLAN STUDY.
THESE
INVESTIGATIONS IDENTIFIED THE NEED FOR REPAIR AND REFURBISHMENT OF CERTAIN PIPELINES. THE PROPOSED WORKS ARE DESIGNED TO RETURN THE EXISTING SEWERAGE AND DRAINAGE SYSTEMS ΤΟ A FULLY OPERATIONAL STATE AT A MINIMUM COST.
WORK ON THE PROJECT, COMPRISING CLEANSING, RELINING AND REPAIR OF EXISTING SEWERS AND DRAINS, IS SCHEDULED TO START IN NOVEMBER AND WILL TAKE ABOUT 12 MONTHS TO COMPLETE.
THE MAJORITY OF THE WORK WILL BE CARRIED OUT MANHOLES WITH EXCAVATION FROM ROAD SURFACE BEING KEPT TO MINIMUM.
FROM EXISTING AN ABSOLUTE
THE PROJECT IS ALSO PART OF THE STANLEY AREA SEWERAGE AND SEWAGE DISPOSAL SCHEME WHICH WILL PROVIDE SEWERAGE FOR THE TAI TAM REDHILL AND STANLEY AREAS BY 1993 TOGETHER WITH A PLANT TO TREAT DISPOSE OF THE SEWAGE COLLECTED.
THE DEADLINE FOR SUBMITTING TENDERS IS NOON ON AUGUST 10.
0
AND
REMINDER ON DISPLAY OF GOLD AND PLATINUM MARKING ORDER NOTICES
THE CUSTOMS AND EXCISE DEPARTMENT TODAY (FRIDAY) URGED AND JEWELLERY SHOPS OPERATORS ΤΟ DISPLAY IN A CONSPICUOUS WITHIN THEIR SHOPS THE GOLD AND PLATINUM MARKING ORDER NOTICES THEY SHOULD CONTRAVENE THE TRADE DESCRIPTIONS ORDINANCE.
GOLD
PLACE LEST
THE REMINDER WAS MADE FOLLOWING A TOTAL OF NINE SHOPS WERE FOUND TO HAVE FAILED TO PROPERLY DISPLAY THE GOLD AND PLATINUM MARKING ORDER NOTICE IN A TWO-DAY OPERATION, WHICH ENDED DEPARTMENT'S TRADING STANDARD INVESTIGATION BUREAU TO PLATINUM JEWELLERY SHOPS.
TODAY, BY THE INSPECT GOLD AND
WONG, SAID A IN THE NEW
THE PRINCIPAL TRADE CONTROLS OFFICER, MR ANDREW TOTAL OF 48 GOLD AND PLATINUM JEWELLERY SHOPS LOCATED TERRITORIES AND THE OUTLYING ISLANDS OF CHEUNG CHAU AND LANTAU WERE INSPECTED.
/"UNDER THE