THURSDAY, APRIL 19, 1990

25

TEMPORARY ROAD CLOSURE IN SHA TIN

THE TRANSPORT DEPARTMENT ANNOUNCES THAT TO FACILITATE THE CONSTRUCTION OF ROAD T5 IN SHA TIN, FROM SATURDAY (APRIL 21) TO MAY 5, BETWEEN 1 AM AND 6 AM, THE NORTHBOUND SLIP ROAD OF SHA TIN ROAD LINKING SHA TIN ROAD NORTHBOUND) AND SHA TIN WAI ROAD WILL BE TEMPORARILY CLOSED TO ALL TRAFFIC.

LION ROCK TUNNEL

DURING THE CLOSURE, MOTORISTS ON NORTHBOUND ROAD HEADING FOR PRINCE OF WALES HOSPITAL ARE ADVISED TO USE LION ROCK TUNNEL ROAD AND TAI CHUNG KIU ROAD TO REJOIN SHA TIN WAI ROAD SOUTHBOUND.

0

URBAN CLEARWAYS IN WHAMPOA STREET

THE TRANSPORT DEPARTMENT ANNOUNCES THAT FROM SATURDAY (APRIL 21), THE FOLLOWING TRAFFIC CONTROL MEASURES WILL BE IMPOSED AT WHAMPOA STREET IN HUNG HOM:

* THE EXISTING 7 AM TO 7 PM DAILY URBAN

*

CLEARWAY IN WHAMPOA STREET FROM ITS JUNCTION WITH BULKELEY STREET TO A POINT ABOUT 16 METRES SOUTH OF THE SAME JUNCTION WILL BE EXTENDED SOUTHWARDS FOR ABOUT FIVE METRES; AND

THE SECTION OF WHAMPOA STREET FROM ITS JUNCTION WITH BAKER STREET TO A POINT ABOUT 15 METRES NORTH OF THE SAME JUNCTION WILL BE DESIGNATRD AN URBAN CLEARWAY FROM 7 AM ΤΟ 7 PM DAILY.

NO VEHICLES EXCEPT FRANCHISED BUSES WILL FOR PASSENGERS OR GOODS THERE.

BE ALLOWED то STOP

/26

Share This Page