TUESDAY, APRIL 17, 1990

10

TRAFFIC ARRANGEMENTS IN TSUEN WAN, YUEN LONG AND KOWLOON CITY

THE TRANSPORT DEPARTMENT ANNOUNCES THAT FROM 10 AM ON THURSDAY (APRIL 19), THE EASTBOUND KERBSIDE LANE OF CASTLE PEAK ROAD (KWAI CHUNG) FROM A POINT ABOUT 200 METRES WEST OF ITS JUNCTION WITH CHEUNG WING ROAD GYRATORY TO A POINT ABOUT 500 METRES WEST OF THE SAME JUNCTION WILL BE DESIGNATED A BUS LANE.

ALL MOTOR VEHICLES, EXCEPT FRANCHISED BUSES AND THOSE WITH PERMITS ISSUED BY THE COMMISSIONER FOR TRANSPORT, WILL BE PROHIBITED FROM ENTERING THE BUS LANE 24 HOURS DAILY.

AT THE SAME TIME, THE DIRECTION OF TRAFFIC ON TAI SHU HA ROAD WEST IN YUEN LONG WILL BE TEMPORARILY RE-ROUTED TO ONE-WAY NORTHBOUND FOR TWO MONTHS TO FACILITATE ROAD RECONSTRUCTION.

VEHICULAR ACCESS TO TAI SHU HA ROAD WEST FROM TAI

WILL BE VIA TAI SHU HA ROAD EAST.

TONG ROAD

IN ADDITION, FROM 1 AM TO 5 AM ON THURSDAY, THE SECTION OF TUNG TAU TSURN ROAD IN KOWLOON CITY BETWEEN TUNG LUNG ROAD AND FUNG MO STREET WILL BE CLOSED TO FACILITATE THE CONSTRUCTION OF A FOOTBRIDGE ACROSS TUNG TAU TSUEN ROAD.

MOTORISTS ON TUNG TAU TSUEN ROAD SOUTHBOUND HEADING FOR JUNCTION ROAD ARE ADVISED TO TRAVEL VIA FUNG MO STREET AND HENG LAM STREET.

MOTORISTS ON FUNG MO STREET HEADING FOR TUNG LUNG ROAD OR TSING ROAD ARE ADVISED TO TRAVEL VIA HENG LAM STREET, JUNCTION AND TUNG TAU TSUEN ROAD.

TUNG

ROAD

ALSO, MOTORISTS ON JUNCTION ROAD HEADING ADVISED TO TRAVEL VIA HENG LAM STREET, FUNG MO TSUEN ROAD.

FOR WONG TAI SIN ARR STREET AND TUNG TAU

/11

Share This Page