WEDNESDAY, FEBRUARY 28, 1990

24

TRAFFIC ARRANGEMENTS IN WAN CHAI

THE TRANSPORT DEPARTMENT ANNOUNCES THAT FROM FRIDAY (MARCH 2), TWO SECTIONS OF ROADS IN WAN CHAI WILL BE TEMPORARILY CLOSED ΤΟ VEHICULAR TRAFFIC TO FACILITATE CABLE LAYING WORKS.

STONE NULLAH LANE BETWEEN JOHNSTON ROAD AND CROSS STREET WILL BE CLOSED FROM 9 PM TO 6 AM THE FOLLOWING DAY FOR THREE DAYS UNTIL MARCH 4.

THE JUNCTION OF KING SING STREET WITH STONE BE CLOSED FOR 10 DAYS UNTIL MARCH 11.

NULLAH LANE WILL

DURING THE CLOSURE PERIOD, KING SING STREET WILL BE RE-ROUTED TO TWO-WAY CUL-DE-SAC, AND HING WAN STREET TO ONE-WAY EASTBOUND. TRAFFIC ON STONE NULLAH LANE HEADING FOR KING SING STREET STREET WILL BE DIVERTED VIA HING WAN STREET.

7

OR KENNEDY

URBAN CLEARWAY IN CENTRAL

* * * * *

THE TRANSPORT DEPARTMENT ANNOUNCES THAT FROM 10 AM ON FRIDAY (MARCH 2), THE SOUTHERN KERBSIDE LANE OF WESTBOUND CONNAUGHT ROAD CENTRAL FROM A POINT ABOUT 30 METRES WEST OF ITS JUNCTION WITH JUBILEE STREET TO ITS JUNCTION WITH GILMAN STREET EXCLUDING THE LAY-BY, WILL BE DESIGNATED AN URBAN CLEARWAY 24 HOURS DAILY FOR THREE MONTHS TO FACILITATE ROAD RE-CONSTRUCTION WORKS.

NO VEHICLES EXCEPT FRANCHISED BUSES WILL BE ALLOWED то STOP FOR PASSENGERS OR GOODS THERE.

0

URBAN CLEARWAYS IN KOWLOON BAY

* * *

THE TRANSPORT DEPARTMENT ANNOUNCES THAT FROM 10 AM ON (MARCH 2), TWO ROAD SECTIONS IN KOWLOON BAY WILL BE DESIGNATED CLEARWAYS.

FRIDAY URBAN

-

THE EASTERN KERBSIDE LANE OF WANG KWONG ROAD FROM ITS WITH KAI YAN STREET TO A POINT ABOUT 110

JUNCTION METRES TO THE NORTH BECOME A PEAK HOUR (7 AM

WILL 10 AM AND 4 PM

7 PM) DAILY URBAN CLEARWAY.

AND MADE A

ALSO, KAI LOK STREET FROM ITS JUNCTION WITH WANG CHIU ROAD KAI LAI ROAD TO A POINT ABOUT 40 ETRES TO THE EAST 7 AM TO MIDNIGHT DAILY URBAN CLEARWAY,

NO VEHICLES EXCEPT FRANCHISED BUSES WILL BE FOR PASSENGERS OR GOODS WITHIN THE RESTRICTED AREAS.

WILL BE

ALLOWED ΤΟ

STOP

0

-

/25

Share This Page