WEDNESDAY, DECEMBER 27, 1989

*

*

ROAD

THE EASTBOUND CARRIAGEWAY OF NEW TERRITORIES CIRCULAR FROM SHEK WU WAI TO CHAU TAU (NEAR PAK SHEK AU INTERCHANGE) INCLUDING ALL ITS SLIP ROADS ;

ALL THE SLIP ROADS LEADING TO/FROM THE WESTBOUND CARRIAGEWAY OF NEW TERRITORIES CIRCULAR ROAD SECTION BETWEEN CHAU TAU (NEAR PAK SHEK AU INTERCHANGE) AND SHEK WU WAI; AND

SAN SHAM ROAD SECTION BETWEEN SAN TIN INTERCHANGE AND A POINT ABOUT 400 METRES NORTH OF THE SAME INTERCHANGE.

ALL PUBLIC LIGHT BUSES, EXCEPT THOSE WITH PERMITS ISSUED BY THE COMMISSIONER FOR TRANSPORT, WILL BE PROHIBITED FROM ENTERING THE PROHIBITED ZONES 24 HOURS DAILY.

ROAD WA1, AND

AT THE SAME TIME, THE SECTION OF NEW TERRITORIES CIRCULAR BETWEEN CHAU TAU (NEAR PAK SHEK AU INTERCHANGE) AND SHEK WU SAN SHAM ROAD WILL BE DESIGNATED A LEARNER DRIVERS BAN ZONE.

TRAFFIC, TRANSPORT ARRANGEMENTS IN SHEK WAI KOK, CHEUNG SHAN

* * *

THE TRANSPORT DEPARTMENT

ANNOUNCED

THAT то FACILITATE THE TRAFFIC AND TRANSPORT

CONSTRUCTION OF ROUTE 5. THE FOLLOWING ARRANGEMENTS IN SHEK WAL KOR AND CHEUNG SHAN IN THE NEW TERRITORIES WILL BE IMPLEMENTED FROM 10 AM ON FRIDAY (DECEMBER 29):

THE SECTION OF CHEUNG PEI SHAN ROAD BETWEEN TSUEN KAM INTERCHANGE AND CHEUNG SHAN ESTATE ROAD WEST WILL BE CLOSED.

THE SECTION OF SHEK WAT KOK ROAD BETWEEN WAI TSUEN ROAD AND YI PEI CHUN ROAD WILL BE FULLY REOPENED.

WO YI HOP INTERCHANGE WILL BE OPENED.

SHEK ON STREET WILL BE RE-ROUTED

TWO-WAY.

FROM ONE-WAY NORTHBOUND то

SHEK KWAI STREET WILL BE RE-ROUTED FROM ONE-WAY WESTBOUND TO

TWO-WAY.

TRAFFIC FROM TSUEN KAM INTERCHANGE HEADING FOR KWAI CHUNG BE DIVERTED TO OPERATE VIA WAI TSUEN ROAD, SHEK WAT KOK ROAD, Y] CHUN ROAD, SAM TỤNG UR ROAD, WO YI HOP INTERCHANGE, WO YI HOP INSTEAD OF CHEUNG PRI SHAN ROAD, CHRUNG SHAN ESTATE ROAD WEST, ACCESS ROAD TO CHEUNG SHAN ESTATE, AND WO YI HOP ROAD.

/TRAFFIC FROM

WILL

PEI

ROAD THE

Share This Page