RECONSTRUCTION OF
SECTIONS
OF EXISTING
FOOTPATHS:
CONSTRUCTION OF
ASSOCIATED
CARPARKING
CARRIAGEWAYS AND
SPACES, FOOTPATHS,
TODAY,
STAIRCASES AND RETAINING WALLS;
ASSOCIATED DRAINAGE AND SLOPE WORKS; AND
OF A
CARRIAGEWAYS AND PORTION OF KENNEDY
PERMANENT CLOSURE OF SECTIONS OF EXISTING FOOTPATHS AND TEMPORARY CLOSURE ROAD EAST OF ELECTRIC HOUSE.
A NOTICE ON THE PROPOSED WORKS WAS
THE PLAN AND SCHEME MAY BE GOVERNMENT OFFICES:
PUBLISHED IN THE
GAZETTE
INSPECTED AT THE FOLLOWING
MAIN
CENTRAL AND WESTERN DISTRICT OFFICE, CENTRAL ENQUIRY SUB-OFFICE. CENTRAL ENTRANCE LOBBY, HONG KONG:
GOVERNMENT
OFFICES.
WING, WEST
*
HONG KONG WEST DISTRICT LANDS OFFICE, CENTRE, 130 HENNESSY ROAD. WAN CHAT:
19TH
FLOOR.
SOUTHORN
CENTRAL AND WESTERN DISTRICT OFFICE, GROUND BUILDING, 38 PIER ROAD, HONG KONG.
FLOOR. HARBOUR
THOSE WISHING TO OBJECT TO THE PROPOSED WORKS SHOULD
THE SECRETARY FOR TRANSPORT, CENTRAL GOVERNMENT
WRITE TO
OFFICES. EAST WING, SECOND FLOOR, LOWER ALBERT ROAD. HONG KONG NOT LATER THAN JANUARY 23.
NEW ROADS TO BE BUILT IN TAI PO
¥
THE TERRITORY DEVELOPMENT DEPARTMENT IS PLANNING TO ROADS TO IMPROVE VEHICULAR AND PEDESTRIAN CIRCULATION IN TAI PO.
THE
ARE WORKS
PART OF THE DEVELOPMENT OF TAI PO NEW TOWN.
CONTINUING
BUILD NEW AREA 17 OF
PROGRAMME
FOR THE
OF A VEHICULAR ASSOCIATED
THE CONSTRUCTION THE PROPOSED WORKS INVOLVE ROAD CONNECTING TING KOK ROAD AND ON PO ROAD TOGETHER WITH FOOTPATHS, CYCLE TRACKS, LANDSCAPED AREAS AND A LAY-BY.
A SECTION OF EXISTING FOOTPATH AND CYCLE TRACK ALONG ROAD WILL ALSO BE RECONSTRUCTED.
TING KOK
/THE WORKS