6
SATURDAY, NOVEMBER 4, 1989
GOVERNMENT ON
то EFFORTS
TACKLE
WATER
POLLUTION
IN
THE
TERM MEASURES WERE BEING
DISTRICT, MR LAN SAID BOTH SHORT AND LONG TAKEN TO IMPROVE WATER QUALITY AT THE POPULAR BEACHES.
MAIN
CLEARANCE
AND INCLUDE INTERCEPTION
DIVERSION AREAS. SWIMMING
REPAIR TO OF SQUATTERS ON
OF SEWAGE THE BEACH
MEASURES SHORT TERM POLLUTING DRAINS AWAY FROM OUTFALL PIPES IN REPULSE BAY.
HINTERLAND AND BANNING OF LIVESTOCK-KEEPING.
THE
COASTAL
THE LONG-TERM MEASURE TAKE THE FORM OF A CONSULTANCY
WHICH WILL PROVIDE PROPER SEWAGE FORMULATE A MASTER SEWERAGE PLAN
AREAS FROM
WAVE
BAY DISPOSAL FACILITIES FOR SHOUSON HILL.
STUDY то
BIG
то
THE
CHAIRMAN
THE
DISTRICT
THE
OPENING
HAD
MADE IN
TURNING TO THE DISTRICT FESTIVAL,
MR LAN PRAISED AND
OF THE ORGANISING COMMITTEE, MRS SO CHAU YIM-PING, BOARD CHAIRMAN, WHO IS ALSO CHAIRMAN OF THE COMMITTEE ON
EFFORTS THEY THE FOR HUI YUNG-CHUNG. CEREMONY, NR ORGANISING THE EVENTS.
HE DESCRIBED THE DISTRICT FESTIVAL AS A BIG BOOST TO BUILDING EFFORTS IN THE DISTRICT.
RS OUTLINES MASSIVE DEVELOPMENTS IN WONG TAI SIN
COMMUNITY
BE
WONG ΤΑΙ SIN IN KONG AND KOWLOON.
SEVERAL MAJOR PUBLIC AND PRIVATE DEVELOPMENT PROJECTS WILL COMPLETED IN THE DIAMOND HILL AND TAI HOM AREAS IN THE COMING YEARS. THE REGIONAL SECRETARY FOR HONG MR DAVID LAN. SAID THIS (SATURDAY) EVENING,
OF THE 1989 WONG TAI SIN HALL. MR LAN SAID THE
WHICH CAIRN
WAS TUNNEL.
NEEDED
SPEAKING AT THE OPENING CEREMONY DISTRICT FESTIVAL AT THE ACADEMIC COMMUNITY
TATE'S BILLION PROJECTS INCLUDED THE SCHEDULED FOR COMPLETION IN MID-1991 TO PROVIDE A FURTHER MUCH LINK BETWEEN KOWLOON AND SHA TIN.
$2
KILOMETRES. 3.9
WOULD BE THE CONGESTION
HE SAID THE TUNNEL. MEASURING LONGEST ROAD TUNNEL IN HONG KONG AND WOULD RELIEVE TRAFFIC IN THE LION ROCK TUNNEL.
TRAFFIC
TO BE
A NUMBER OF GOVERNMENT ROAD PROJECTS WOULD AT THE SAME TIME TO CATER FOR THE TUNNEL. HE ADDED.
ALSO BE COMPLETED GENERATED BY THE
OF A NEW TRUNK
SHAN
IN SHA BYPASS.
"THE TATE'S CAIRN TUNNEL WILL THUS FORM PART ROUTE LINKING QUARRY BAY ON HONG KONG ISLAND WITH MA ON TIN VIA THE EASTERN HARBOUR CROSSING AND THE KWUN TONG
1 F
THE COMPLETED.
TRAVELLING TIME AND SHA TIN WILL ISLAND TO WONG TAI SIN
HE SAID.
BR
"WHEN ALL THESE PROJECTS ARE FROM QUARRY BAY ON THE SUBSTANTIALLY REDUCED.
ER LAN