FRIDAY, NOVEMBER 3, 1989

6

END-USE

OF

BUILDINGS

STRUCTURES,

CONTRACTORS

THE

AND WHEN ANALYSED BY

PERFORMED BY MAIN

AT GROSS VALUE OF CONSTRUCTION WORK

INCLUDE CONSTRUCTION SITES IN RESPECT OF RESIDENTIAL BUILDINGS (WHICH

BUILDINGS) AND TRANSPORT AND NON-RESIDENTIAL COMBINED RESIDENTIAL

AND 81.450 PROJECTS IN THE SECOND QUARTER OF 1989 WAS $3,989 MILLION MILLION RESPECTIVELY.

11. 6 PER CENT

10.4 PER

THIS REPRESENTED INCREASES OF 7.0 PER CENT AND

OF RESPECTIVELY OVER THE PRECEDING QUARTER, AND 24.6 PER CENT OVER THE SECOND QUARTER OF 1988.

CENT AND

PERFORMED THE GROSS VALUE OF CONSTRUCTION WORK CONTRACTORS AT CONSTRUCTION SITES IN RESPECT OF COMMERCIAL

81.418 MILLION, REPRESENTING IN THE SECOND QUARTER OF 1989 DECREASE OF 9.6 PER CENT COMPARED WITH THE PRECEDING INCREASE OF 24.3 PER CENT OVER THE SECOND QUARTER OF 1988.

WAS

CONSTRUCTION

BY MAIN BUILDINGS A QUARTER BUT AN

PRACTICE IN THE CAN BE A MAIN CONTRACT

SUB-CONTRACTING WIDESPREAD OWING TO THE

ESTABLISHMENT A CONSTRUCTION SECTOR, CONTRACTOR FOR ONE CONTRACT AND A SUB-CONTRACTOR FOR ANOTHER SIMULTANEOUSLY.

WORK PERFORMED BY MAIN THE GROSS VALUE OF CONSTRUCTION

ESTABLISHMENTS CONTRACTORS REFERS TO THE OUTPUT OF THOSE CONSTRUCTION IN THE PROJECTS IN WHICH THEY TAKE THE ROLE OF A MAIN CONTRACTOR, DOES NOT INCLUDE THE CONSTRUCTION OUTPUT OF PROJECTS WHERE THE ROLE OF SUB-CONTRACTORS.

AND THEY PLAY

HOWEVER, SUB-CONTRACTORS' CONTRIBUTION TO PROJECTS SHOULD

CONSTRUCTION WORK BEEN INCLUDED IN THE GROSS VALUE OF THE MAIN CONTRACTORS FOR WHOM THEY WORKED.

HAVE PERFORMED BY

THE QUARTER 1989".

MORE DETAILED INFORMATION ON CONSTRUCTION OUTPUT

SURVEY OF CONSTRUCTION THE QUARTERLY REPORT ON

19 GIVEN IN 2ND OUTPUT,

SALE

FLOOR,

THE REPORT IS ON PUBLICATIONS CENTRE, GPO BUILDING, CONNAUGHT PLACE,

PUBLICATIONS AND STATISTICS THE CENSUS

ROAD, WANCHAI TOWER 1, 19TH

SUBSCRIPTION MAY ALSO BE ARRANGED.

ENQUIRIES ABOUT THE SURVEY MAY BE CONSTRUCTION AND REAL ESTATE STATISTICS STATISTICS DEPARTMENT ON TEL. 5-8234860.

DIRECTED ΤΟ THE SECTION OF THE

BUILDING, CENSUS AND

AT $2.50 A

COPY AT THE GOVERNMENT CENTRAL, AND AT

DEPARTMENT

12 HARBOUR

WAN

SALES

CHAI.

COUNTER,

REGULAR

17

Share This Page