21
SATURDAY. OCTOBER 21. 1989
TRAFFIC ARRANGEMENT IN PRINCE EDWARD ROAD
WESTBOUND TRAFFIC ALONG PRINCE EDWARD ROAD WEST WILL BE BANNED FROM TURNING RIGHT INTO LA SALLE ROAD FROM 10 AM ON WEDNESDAY (OCTOBER 251 TO FACILITATE WORKS FOR THE LAYING OF AN ANTI-SKID ROAD SURFACE. THE TRANSPORT DEPARTMENT ANNOUNCES.
OF
THE HIGHWAYS DEPARTMENT WILL WORK ON EACH OF THE FOUR LANES PRINCE EDWARD ROAD WEST AT ITS JUNCTION WITH LA SALLE ROAD TO REPAIR DEFECTIVE ROAD SLABS BEFORE LAYING ANTI-SKID SURFACE DRESSING.
THE PROJECT IS EXPECTED TO BE COMPLETED IN FIVE WEEKS.
TRAFFIC HEADING FOR LA SALLE ROAD WILL BE TEMPORARILY
ROUTED
VIA PRINCE EDWARD ROAD WEST. WATERLO0 ROAD. BOUNDARY STREET. EARL STREET. PRINCE EDWARD ROAD WEST AND THEN TO LA SALLE ROAD.
TO
DURING THE CONSTRUCTION PERIOD. THE EXISTING OPTIONAL STRAIGHT AHEAD AND TURN RIGHT ROAD MARKING IN THE FAST LANE WILL BE CHANGED STRAIGHT AHEAD. THE TURNING POCKET WILL ALSO BE REMOVED.
APPROPRIATE SIGNS AND LIGHTING WILL BE ERECTED TO GUIDE
MOTORISTS.
TRAFFIC ARRANGEMENT IN KWAI CHUNG
THE TRANSPORT DEPARTMENT ANNOUNCES THAT A SECTION OF SOUTHBOUND CASTLE PEAK ROAD IN KWAI CHUNG BETWEEN WAH KING HILL ROAD AND BUTTERFLY VALLEY INTERCHANGE WILL BE CLOSED FROM 2 AM TO 4 AM ON MONDAY (OCTOBER 23).
THE CLOSURE IS TO FACILITATE THE TRANSPORTATION TRANSFORMER BY CHINA LIGHT AND POWER COMPANY LIMITED.
WILL
OF A 250-TON
MOTORISTS ON CASTLE PEAK ROAD SOUTHBOUND HEADING FOR KOWLOON BE DIVERTED TO TRAVEL VIA WAH KING HILL ROAD. TAI WO INTERCHANGE, WAH YIU ROAD. LAI CHI LING ROAD, LIM CHO STREET. KING CHO ROAD. LAI KING HILL ROAD. PRINCESS MARGARET HOSPITAL INTERCHANGE. KWAI CHUNG ROAD AND/OR CHING CHEUNG ROAD,
MOTORISTS ARE ALSO
TRAVELLING TO KOWLOON
AND
TO
ADVISED TO USE AVOID CASTLE
KWAI CHUNG ROAD FOR PEAK ROAD DURING THE
CLOSURE.
/22
·