THURSDAY, OCTOBER 12, 1989

27

TRAFFIC ARRANGEMENTS IN CENTRAL

* * * *

QUEEN'S

BE CLOSED 15, 17

THE TRANSPORT DEPARTMENT ANNOUNCES THAT THE SECTION OF ROAD CENTRAL BETWEEN ICE HOUSE STREET AND BANK STREET WILL TO TRAFFIC BETWEEN 1 AM AND 6.30 AM ON OCTOBER 14 (SATURDAY), AND 18 TO FACILITATE THE CONSTRUCTION OF THE BATTERY PATH FOOTBRIDGE.

DURING THE CLOSURE, THE FOLLOWING TRAFFIC RE-ROUTEINGS WILL

ALTERNATIVE IMPLEMENTED AND MOTORISTS ARE ADVISED TO TAKE SHEUNG WAN:

BE

ROUTES TO

BANK STREET WILL BE RE-ROUTED ONE-WAY NORTHBOUND.

FROM ONE-WAY

SOUTHBOUND

TO

HOUSE

BETWEEN DES VOEUX THE SECTION OF ICE

RE-ROUTED WILL ROAD CENTRAL CENTRAL AND QUEEN'S ONE-WAY NORTHBOUND TO ONE-WAY SOUTHBOUND.

STREET

ROAD

BE

FROM

VIA PROCEED

DES VOEUX

MOTORISTS ON QUEENSWAY ARE ADVISED TO ROAD CENTRAL AND ICE HOUSE STREET TO JOIN QUEEN'S ROAD CENTRAL.

MOTORISTS FROM HILTON HOTEL AND

GARDEN ROAD MULTI-STOREY BANK STREET, DES VOEUX CARPARK BUILDING ARE ADVISED TO PROCEED VIA ROAD CENTRAL AND ICE HOUSE STREET TO JOIN QUEEN'S ROAD CENTRAL.

URBAN CLEARWAYS IN KWUN TONG

A

THE TRANSPORT DEPARTMENT ANNOUNCES THAT FROM 10 AM ON SATURDAY CHEUNG YIP (OCTOBER 14), THE SECTION OF THE EASTERN KERBSIDE LANE OF STREET IN KWUN TONG BETWEEN ITS JUNCTION WITH TSUI HING STREET AND POINT ABOUT 36.5 METRES NORTH OF THE SAME JUNCTION WILL BE AN URBAN CLEARWAY 24 HOURS DAILY.

DESIGNATED

OP

AT THE SAME TIME, THE SECTION OF THE NORTHERN KERBSIDE LANE

A POINT LAM HING STREET BETWEEN ITS JUNCTION WITH WANG CHIU ROAD AND

WILL BE DESIGNATED AN ABOUT 117.5 METRES EAST OF THE SAME JUNCTION URBAN CLEARWAY FROM 7 AM TO 7 PM DAILY.

NO VEHICLES EXCEPT FRANCHISED BUSES WILL FOR PASSENGERS OR GOODS THERE.

BE ALLOWED TO STOP

1

/28

Share This Page