15
FRIDAY, OCTOBER 6, 1989
INCLUDE THE WORKS
THE SUPPLY,
TESTING INSTALLATION, SUBMERGED BOWL PUMPS, COMMISSIONING OF FOUR VERTICAL SPINDLE,
SERVICES, BUILDING VOLTAGE ELECTRICAL SYSTEMS, TELEMETRY SYSTEM AND ASSOCIATED ELECTRICAL AND MECHANICAL WORKS.
TENDERS
WILL BE INVITED CONTRACTORS FOR THE WORKS.
CONTRACTORS
INSTRUMENTATION
AND
HIGH
AND
NEXT MONTH FROM PREQUALIFIED
FROM DOCUMENTS ITS ADDRESS IS SECOND
CAN APPLY FOR FREQUALIFICATION
WORKS. THE BALFOURS-HASWELL WHICH DESIGNED FLOOR, MAGNOLIA MANSION, 2-4 TIN HAU TEMPLE ROAD, NORTH POINT.
COMPLETED PREQUALIFICATION DOCUMENTS SHOULD LATER THAN NOON ON OCTOBER 27.
BE SUBMITTED NOT
TUEN MUN. NORTH DISTRICT LOTS TO BE RESUMED
* * * *
TA
THE GOVERNMENT IS TO RESUME A TOTAL TUEN MUN AND NORTH DISTRICT FOR DEVELOPMENT.
OF 114 PRIVATE LOTS IN
THE LOTS TOTAL 90,827.6 SQUARE AGRICULTURAL LOTS.
METRES AND MOST
ARE PRIVATE
+
OF
THE
SQUARE
PRIVATE LOTS WITH A ARE AGRICULTURAL LAND,
EFFLUENT OUTFALL ACCESS ROAD AT PO
THE LOTS IN TUEN MUN. WHICH INCLUDE 105
METRES OF TOTAL AREA
40,812.2
OF PIPELINES CONSTRUCTION REQUIRED FOR FORESHORE CHAMBERS AT LUNG KWU SHEUNG TAN AND AN TONG HA, TUEN MUN.
AND
LOTS WITH A METRES LAND AND
THE LAND IN NORTH DISTRICT INCLUDES NINE PRIVATE TOTAL AREA OF 50,015.4 SQUARE METRES COMPRISING 5,654.2 SQUARE
METRES OF GARDEN OF AGRICULTURAL LAND, 29,690.8 14,670.4 SQUARE METRES OF BUILDING LAND.
THE
SQUARE
CONSTRUCTION IT IS REQUIRED FOR HOSPITAL AND ASSOCIATED ROADS AND DRAINS.
OF THE
NORTH
DISTRICT
BOTH PROJECTS ARE PROGRAMMED TO START IN DECEMBER.
NOTICES ON THE RESUMPTION OF THE LAND GAZETTE TODAY (FRIDAY).
WERE PUBLISHED IN THE
THE LOTS WILL REVERT TO THE GOVERNMENT ON THE EXPIRY MONTHS FROM THE DATE OF THE POSTING OF NOTICES ON THE LOTS.
OF THREE
/16