11
SUNDAY. SEPTEMBER 10. 1989
SPECIAL TRAFFIC ARRANGEMENTS IN YAU MA TEI
THE
TRANSPORT DEPARTMENT
THAT ANNOUNCES
SPECIAL TRAFFIC MA TEI FRUIT ARRANGEMENTS WILL BE INTRODUCED IN THE AREA OF THE YAU
121 AND 8
ON (SEPTEMBER
PM AM ON TUESDAY MARKET BETWEEN 12.01
INCREASE IN CATER FOR THE ANTICIPATED THURSDAY (SEPTEMBER 141 TO PEDESTRIAN AND TRAFFIC TO THE YAU MA TEI FRUIT MARKET.
THESE ARRANGEMENTS ARE:
*
RECLAMATION STREET NORTHBOUND BETWEEN THE UNNAMED ROAD SOUTH AND WATERLOO ROAD OF SHEK LUNG STREET AND WATERLOO ROAD:
STREET WILL WESTBOUND BETWEEN RECLAMATION STREET AND FERRY BE REDUCED FROM THREE-LANE TO TWO-LANE TRAFFIC.
THE UNNAMED ROAD SOUTH OF SHEK LUNG STREET WILL BE RE-ROUTED FROM TWO-WAY TO ONE-WAY WESTBOUND.
CHING PING STREET WILL BE RE-ROUTED ONE-WAY SOUTHBOUND.
TUNG KUN STREET WILL BE RE-ROUTED ONE-WAY WESTBOUND.
RIGHT TURNING FROM CANTON ROAD NORTHBOUND TO TUNG KUN STREET WILL BE BANNED.
SHEK LUNG STREET BETWEEN STREET: AND MAN MING LANE
SHANGHAI
STREET
WILL
PEDESTRIAN PRECINCT.
RECLAMATION
BETWEEN CLOSED BE
STREET AND
STREET RECLAMATION
AND
CONVERTED
SHANGHAI AND INTO A
*
THE METERED PARKING SPACES IN
CANTON ROAD
BETWEEN
CHEUNG STREET: ROAD AND CHING PING
SHUI STREET AND THE UNNAMED ROAD SOUTH OF SHEK LUNG AND IN LEE TAT STREET BETWEEN CANTON STREET WILL BE SUSPENDED.
TRAFFIC ARRANGEMENT IN SHAM SHUI PO
ON TUESDAY
THE TRANSPORT DEPARTMENT ANNOUNCES THAT FROM 10 AM
PO (SEPTEMBER 12), THE SECTION OF TAI BANG SAI STREET BETWEEN NAM STREET AND NAM SHAN CHUEN ROAD IN SHAM SHUI OPERATION UPON COMPLETION OF ROADWORKS THERE.
WILL
RESUME
CHRONG
TWO-WAY
WILL
RESUME TAI HANG
ITS SAL
AT THE SAME TIME, GREEN MINIBUS ROUTE NO. 12 ORIGINAL ROUTEING TO OPERATE VIA TAI HANG TUNG ROAD, STREET AND NAM CHEONG STREET ON JOURNEYS TO PAK TIN.