11

WEDNESDAY, SEPTEMBER 6. 1989

TEMPORARY TRAFFIC ARRANGEMENTS FOR KING'S ROAD RECONSTRUCTION * * * * *

ON FRIDAY IMPLEMENTED IN

ANNOUNCES THAT FROM 10 AM THE TRANSPORT DEPARTMENT (SEPTEMBER 81, TEMPORARY TRAFFIC ARRANGEMENTS WILL BE NORTH POINT TO FACILITATE THE RECONSTRUCTION OF KING'S ROAD.

BOAT STREET WILL BE CLOSED TO TRAFFIC FOR ABOUT SIX MONTHS,

VEHICLES ON GORDON

ROAD

HEADING

FOR

ROAD KING'S

BETWEEN BOAT STREET AND POWER STREET WILL HAVE TO SOUTHBOUND AND WING HING STREET.

EASTBOUND USE ELECTRIC ROAD

EASTERN CORRIDOR EASTBOUND

THE DOWN RAMP LEADING FROM ISLAND TO KING'S ROAD WESTBOUND WILL ALSO BE CLOSED FOR ABOUT 10 MONTHS.

RAMP LEADING VEHICLES WILL BE DIVERTED TO TRAVEL VIA THE DOWN

ROAD. JAVA ROAD AND FROM ISLAND EASTERN CORRIDOR TO TONG SHUI

KAM

HONG STREET.

SECTIONS

IN ADDITION, THE FOLLOWING ROAD URBAN CLEARWAYS DURING THE TIME SPECIFIED BELOW:

ROUND-THE-CLOCK FOR ABOUT SIX MONTHS:

WILL

BE DESIGNATED

*

*

KING'S ROAD EASTBOUND FROM ITS JUNCTION WITH OIL A POINT ABOUT 80 METRES EAST OF BOAT STREET:

STREET TO

FROM ITS JUNCTION METRES NORTH OF THE

THE EASTERN KERBSIDE LANE OF OIL STREET WITH KING'S ROAD TO A POINT ABOUT 10 SAME JUNCTION;

BOAT STREET BETWEEN ITS JUNCTION POINT ABOUT FIVE METRES NORTH OF THE SAME JUNCTION;

WITH KING'S ROAD

AND

KING'S ROAD EASTBOUND FROM ITS JUNCTION

WITH POWER

STREET

TO A POINT ABOUT 25 METRES EAST OF THE SAME JUNCTION;

*

KING'S ROAD AND A POWER STREET BETWEEN ITS JUNCTION WITH POINT ABOUT 20 METRES NORTH OF THE SAME JUNCTION:

FROM ITS

TIN JUNCTION WITH

CHONG

KING'S ROAD EASTBOUND STREET TO A POINT ABOUT 15 METRES EAST OF THE SAME JUNCTION; AND

TIN CHONG STREET BETWEEN ITS JUNCTION WITH KING'S A POINT ABOUT 35 METRES NORTH OF THE SAME JUNCTION.

ROUND-THE-CLOCK FOR ABOUT 10 MONTHS:

ROAD AND

*

KING'S ROAD EASTBOUND FROM A POINT ABOUT 140 METRES WEST

SHUI ROAD ITS JUNCTION WITH TING

TO A POINT ABOUT METRES EAST OF THE SAME JUNCTION.

OF

100

/FROM 7

Share This Page