13
SATURDAY, JUNE 3, 1989
OF
AT
THE
SOCIAL
SPEAKERS AT THE WORKSHOP INCLUDED PRINCIPAL MAGISTRATE CENTRAL MAGISTRACY, MISS LEAH CANNON; ASSISTANT DIRECTOR WELFARE AND PRINCIPAL PROBATION OFFICER, MR KWOK KA-CHI; AND CHIEF SOCIAL WORK OFFICER (YOUTH AND CORRECTIONS), MR ANTHONY CHAN.
SPEAKING AT THE OPENING OF THE WORKSHOP, MR KWOK COMMENDED THE PARTICIPANTS FOR THEIR HARD WORK IN COPING WITH THE HEAVY WORKLOAD DESPITE STAFFING CONSTRAINTS.
TRAFFIC ARRANGEMENT IN MA TAU WAI
* * * * *
FACILITATE NORTHBOUND
THE TRANSPORT DEPARTMENT ANNOUNCES THAT IN ORDER TO SEWER LAYING WORK, THE RIGHT-TURN FROM MA TAU WAI ROAD INTO BAILEY STREET EASTBOUND WILL BE BANNED WITH FROM 10 AM ON MONDAY (JUNE 5) FOR SEVEN WEEKS.
DURING THIS PERIOD, VEHICLES ON MA TAU WAI ROAD NORTHBOUND HEADING FOR BAILEY STREET EASTBOUND WILL BE DIVERTED TO TRAVEL VIA SAN LAU STREET, CHATHAM ROAD NORTH, CHI KIANG STREET, TO KWA WAN ROAD AND MA TAU WAI ROAD SOUTHBOUND.
TEMPORARY TRAFFIC ARRANGEMENTS IN NORTH POINT
THE TRANSPORT DEPARTMENT ANNOUNCES THAT FROM 10 AM ON MONDAY (JUNE 5), VEHICLES EXCEEDING SEVEN METRES IN LENGTH WILL NOT BR ALLOWED TO TURN RIGHT FROM ELECTRIC ROAD TO TSING FUNG STREET NORTH POINT.
IN
AT THE SAME TIME, THE NORTHERN KERBSIDE LANE OF TSING FUNG STREET BETWEEN ITS JUNCTION WITH ELECTRIC ROAD AND A POINT 25 METRES TO THE WEST WILL BE DESIGNATED A 7 AM TO 7
ABOUT PM
DAILY URBAN CLEARWAY.
THESE MEASURES WILL LAST FOR ABOUT THREE WEEKS ROAD RECONSTRUCTION WORKS.
то FACILITATE