12
SATURDAY, MAY 13, 1989
TEMPORARY URBAN CLEARWAYS IN NORTH POINT, SAI YING PUN
MONDAY
THE TRANSPORT DEPARTMENT ANNOUNCED THAT FROM 10 AM ON (MAY 15), THE SOUTHERN KERBSIDE LANE OF TSAT TSZ MUI ROAD IN NORTH POINT BETWEEN ITS JUNCTION WITH HEALTHY STREET EAST AND A POINT 55 METRES TO THE EAST WILL BE DESIGNATED A 7 AM TO 7 PM DAILY CLEARWAY.
THIS MEASURE WILL LAST FOR ABOUT TWO WEEKS TO MAIN LAYING WORKS.
AT THE SAME TIME, THE
ABOUT URBAN
FACILITATE GAS
SOUTHERN KERBSIDE LANE OF KO SHING STREET IN SAI YING PUN FROM A POINT ABOUT 12 METRES WEST OF ITS JUNCTION WITH LI SHING STREET TO A POINT ABOUT 12 METRES EAST OF THE SAME JUNCTION WILL BE DESIGNATED AN URBAN CLEARWAY ROUND-THE-CLOCK FOR ABOUT FOUR WEEKS FOR DRAINAGE WORKS.
NO VEHICLES EXCEPT FRANCHISED BUSES WILL BE ALLOWED TO STOP FOR PASSENGERS OR GOODS WITHIN THE RESTRICTED ARBAS.
ROAD CLOSURE IN WONG TAI SIN
FACILITATE
THE TRANSPORT DEPARTMENT ANNOUNCED THAT IN ORDER TO CABLE LAYING WORKS BY THE CHINA LIGHT AND POWER CO. LTD AT KING HONG STREET BETWEEN ITS STREET IN SAN PO KONG, THE SECTION OF KING HỌNG
AND JUNCTION WITH THE ACCESS ROAD LEADING TO BLOCKS 5
6
РО OF SAN KONG FACTORY ESTATE AND PRINCE EDWARD ROAD EAST WILL BE CLOSED FROM 9 AM ON MONDAY (MAY 15).
DURING THE CLOSURE, WHICH WILL LAST FOR TWO IN KING FUK STREET HEADING FOR THE FLYOVER LEADING ARE ADVISED TO TRAVEL VIA KING FUK STREET, KING TAI EDWARD ROAD EAST.
WEEKS, MOTORISTS ROAD TO CONCORDE STREET AND PRINCE
TRAFFIC ARRANGEMENT IN KOWLOON CITY
THE TRANSPORT DEPARTMENT ANNOUNCED THAT ON COMPLETION OF THE RECONSTRUCTION OF THE ARGYLE STREET/LOMOND ROAD JUNCTION IN KOWLOON CITY, THE RIGHT TURN FROM PRINCE EDWARD ROAD WEST EASTBOUND ONTO LOMOND ROAD WILL BE RE-OPENED FROM 10 AM ON MONDAY (MAY 15).
/12
·