WEDNESDAY, APRIL 12, 1989°

50

URBAN CLEARWAYS IN MA ON SHAN

* *

THE TRANSPORT DEPARTMENT ANNOUNCED THAT FROM 10

FOLLOWING ROAD (APRIL 14),

SECTIONS IN

ON THE

MA DESIGNATED 7 AM TO MIDNIGHT DAILY URBAN CLEARWAYS:

AM ON FRIDAY SHAN

BE WILL

ON LUK STREET BETWEEN ITS JUNCTION WITH MA ON SHAN ROAD A POINT ABOUT 165 METRES WEST OF THE SAME JUNCTION;

OF ON SHING

THE LOOP ROAD SECTION EASTERN JUNCTION WITH ON LUK STREET;

STREET

AND

NORTH OF ITS

EASTERN JUNCTION

WITH

THE

SAME

ON SHING STREET SOUTHBOUND FROM ITS ON LUK STREET TO A POINT ABOUT 45 METRES SOUTH OF JUNCTION; AND

*

ON SHING STREET NORTHBOUND FROM ITS

EASTERN

JUNCTION THE

WITH

SAME

ON LUK STREET TO A POINT ABOUT 50 METRES SOUTH OF JUNCTION.

BE ALLOWED TO

STOP

NO VEHICLES EXCEPT FRANCHISED BUSES WILL FOR PASSENGERS OR GOODS WITHIN THE RESTRICTED AREAS.

TEMPORARY LANE CLOSURE ON MA TAU WAI ROAD FLYOVER

ANNOUNCED

ON AM

SUNDAY

THAT MA

(APRIL

TAU WAI ROAD

16) BECAUSE OF

THE TRANSPORT DEPARTMENT FLYOVER WILL BE RESTRICTED TO SINGLE-LANE TWO-WAY TRAFFIC FROM 10 AM

10 ON FRIDAY (APRIL 141 TO ROADWORKS,

DURING THE CLOSURE, MOTORISTS ARE ADVISED TO AND PATIENCE.

DRIVE

WITH CARE

TEMPORARY TRAFFIC ARRANGEMENTS IN TUEN MUN

*

AT BIU ROAD 14)

THE TRANSPORT DEPARTMENT ANNOUNCED THAT THE SLIP ROADS LAM INTERCHANGE LINKING TUEN MUN ROAD WESTBOUND AND CASTLE PEAK WILL BE CLOSED BETWEEN MIDNIGHT AND 6 AM DAILY FROM FRIDAY (APRIL FOR TWO NIGHTS FOR ROAD MAINTENANCE WORKS .

MUN ROAD WESTBOUND SHAM TSENG

DURING THE CLOSURE, KMB ROUTE 52M ON TUEN HEADING FOR TUEN MUN WILL BE RE-ROUTED VIA TUEN MUN ROAD, INTERCHANGE AND CASTLE PEAK ROAD.

Share This Page