27

FRIDAY, MARCH 3, 1989

MEANWHILE, THE SLOW LANE OF TAI PO ROAD JUNCTION WITH SHA TIN ROAD WILL BE CLOSED DAILY FROM 7 PM TO 6 AM SOUTHBOUND NEAR NEXT DAY FROM MARCH 6 FOR TWO NIGHTS,

ITS

THE

PO ROAD

IN ADDITION, THE FAST LANE OF THE SAME SECTION OF TAI SOUTHBOUND WILL BE CLOSED DAILY BETWEEN 7 PM AND 6 AM THE NEXT DAY MARCH 9 AND 10.

ON

CARE AND PATIENCE.

MOTORISTS ARE ADVISED ΤΟ DRIVE WITH APPROPRIATE TRAFFIC AIDS WILL BE PROVIDED TO GUIDE THEM.

RE-OPENING OF PAK TIN STREET, SHAM SHUI PO

THE TRANSPORT DEPARTMENT ANNOUNCED THAT PAK TIN STREET IN SHUI PO BETWEEN TAI PO ROAD AND BERWICK STREET WILL

SHAM TRAFFIC FROM 10 AM ON MONDAY (MARCH 6)

BE RE-OPENED ΤΟ ROAD WORKS.

FOLLOWING THE COMPLETION OF

AS A RESULT, KMB ROUTES 2B, 2F, 6D, 40, 86 AND 86A, MINIBUS ROUTE 42 WILL RESUME THEIR NORMAL ROUTEINGS.

IN ADDITION, THESE BUS ROUTES WILL AGAIN OBSERVE THE IN WOH CHAI STREET OUTSIDE BLOCK 29 OF SHEK KIP MEI ESTATE.

AT THE SAME TIME, PUBLIC LIGHT BUSES WILL BE HO STREET BETWEEN TAI PO ROAD AND BERWICK STREET.

AND GREEN

BUS STOP

BANNED

FROM PEI

TEMPORARY LANE CLOSURES ON NT CIRCULAR ROAD

THE TRANSPORT DEPARTMENT

ANNOUNCED THAT ΤΟ

ROAD

FACILITATE CIRCULAR ROAD IN

MAINTENANCE WORK, SECTIONS OF THE NEW TERRITORIES FANLING WILL BE CLOSED TO TRAFFIC DURING THE FOLLOWING PERIODS:

* MARCH 6 OUTER-MOST NORTHBOUND LANE BETWEEN SHBUNG

ROUNDABOUT AND TSUNG PAK LONG.

SHUI

*

MARCH 7

OUTER-MOST NORTHBOUND LANE BETWEEN TSUNG PAK

LONG

AND KWU TUNG.

MARCH 8

-

OUTER-MOST NORTHBOUND LANE BETWEEN KWU TUNG

AND

PAK SHEK AU.

Share This Page