16
FRIDAY, FEBRUARY 10, 1989
TEMPORARY URBAN CLEARWAYS IN WESTERN
AM ON MONDAY THE TRANSPORT DEPARTMENT ANNOUNCED THAT FROM 10
SECTIONS IN WESTERN DISTRICT (FEBRUARY 13), THE FOLLOWING TWO ROAD
WILL BE DESIGNATED URBAN CLEARWAYS ROUND-THE-CLOCK:
CHIU KWONG STREET FROM ITS THE WESTERN KERBSIDE LANE OF JUNCTION WITH DES VOEUX ROAD WEST TO A POINT ABOUT 15 METRES TO THE NORTH; AND
*
THE NORTHERN KERBSIDE LANE OF DES VOEUX ROAD WEST JUNCTION WITH CHIU KWONG STREET TO A POINT ABOUT TO THE EAST.
FROM ITS 30 METRES
THESE MEASURES WILL LAST FOR ABOUT TWO
CONNECTION WORKS,
WEEKS FOR TRAM TRACK
BE ALLOWED TO STOP
NO VEHICLES EXCEPT FRANCHISED BUSES WILL FOR PASSENGERS OR GOODS WITHIN THE RESTRICTED AREAS.
BUS SERVICE ARRANGEMENTS FOR TSING YI BRIDGE IMPROVEMENT
THAT SPECIAL THE TRANSPORT DEPARTMENT REMINDED BUS PASSENGERS
44M WILL BE IMPLEMENTED ARRANGEMENTS FOR KMB BUS ROUTES 41, 44 AND
WORKS ON FROM TOMORROW (SATURDAY) BECAUSE OF THE STAGEII IMPROVEMENT TSING YI BRIDGE.
ROUTE 44 WILL BE DIVERTED VIA CHEUNG BRIDGE AND TSUEN WAN ROAD.
ON ESTATE, TSING TSUEN
ROUTE 41 WILL BE RELOCATED FROM TSING THE TERMINATING POINT OF
CHING HONG YI ESTATE TO CHEUNG CHING ESTATE. IT WILL BE ROUTED VIA
WO ROAD, ROAD, CHUNG MEI ROAD, TSING YI HEUNG SZE WUI ROAD, FUNG SHU TSING TSUEN BRIDGE AND TSUEN WAN ROAD.
ROUTE
FROM
BY
44M
BE RELOCATED WILL THE TERMINATING POINT OF CHEUNG ON ESTATE TO TSING YI ESTATE, OCCUPYING THE BUS BAY VACATED ROUTE 41. IT WILL OPERATE VIA CHEUNG ON ESTATE, TSING TSUEN BRIDGE AND TSUEN WAN ROAD.
WILL BE IMPLEMENTED
THE DURING
WHOLE THESE ARRANGEMENTS
LAST FOR ABOUT 12 SERVICE PERIODS OF THE THREE BUS ROUTES AND WILL MONTHS UNTIL THE BRIDGE IMPROVEMENT WORKS ARE COMPLETED.