28
FRIDAY, DECEMBER 16, 1988
J
THE
A
AND RELIABLE MEANS FOR
SERVICE 19
FAST SPEEDPOST FORWARDING DOCUMENTS, SAMPLES AND MERCHANDISE OVERSEAS.
CUSTOMERS REQUIRING MORE SPECIFIC SPEEDPOST SERVICE TO THESE TWO COUNTRIES
GENERALLY
ARE
REQUESTED
REPRESENTATIVES ON 5-8683868.
TO
INFORMATION ABOUT THE AND THE SPEEDPOST SERVICE
THE CONTACT
POSTAL SERVICES
TEMPORARY URBAN CLEARWAYS IN WESTERN
ROAD SECTIONS AM ON
THE TRANSPORT DEPARTMENT ANNOUNCED THAT SEVERAL IN WESTERN DISTRICT WILL BE DESIGNATED URBAN CLEARWAYS FROM 10 MONDAY (DECEMBER 19).
THE WESTERN KERBSIDE LANE OF KA ON STREET WILL BECOME AN CLEARWAY ROUND-THE-CLOCK FOR ABOUT FOUR WEEKS FOR DRAINAGE WORKS.
URBAN
ALSO BE THE FOLLOWING TWO SECTIONS OF QUEEN'S ROAD WEST WILL
FOR ABOUT FOUR WEEKS FOR ROAD MADE 24-HOUR DAILY URBAN CLEARWAYS
BETWEEN HOUSE RECONSTRUCTION WORKS: THE SOUTHERN KERBSIDE LANE
BETWEEN HOUSE NOS. 150 AND 156; AND THE NORTHERN KERBSIDE LANE AND 197,
NOS.
167
WEST
IN ADDITION, THE SOUTHERN KERRSIDE LANE OF CONNAUGHT ROAD
POINT ABOUT FROM A
METRES 10
EAST
ITS
WATER от
JUNCTION WITH EAST OF THE SAME JUNCTION WILL STREET TO A POINT ABOUT 40 METRES
FOR ABOUT ONE WEEK FOR BECOME A 7 AM TO 7 PM DAILY URBAN CLEARWAY CABLE-DUCT LAYING WORKS.
BE ALLOWED то STOP
NO VEHICLES EXCEPT FRANCHISED BUSES WILL FOR PASSENGERS OR GOODS WITHIN THE RESTRICTED AREAS.
NIGHT CLOSURE OF KWAI TRING ROAD
THE TRANSPORT DEPARTMENT ANNOUNCED THAT KWAI TSING ROAD ΤΑΙ ROAD WILL BE PARTIALLY BETWEEN KWAI TSING ROUNDABOUT AND KWAI
DAY ON DECEMBER CLOSED TO TRAFFIC DAILY FROM 10 PM TO 5 AM THE NEXT 19 TO 21 AND ON JANUARY 9 AND 10.
THE NIGHT CLOSURES ARE NECESSARY BECAUSE RECONSTRUCTION.
}
ON DECEMBER 19 AND JANUARY 9 THE TSING YI OF THIS SECTION OF KWAI TSING ROAD WILL BE CLORED.
OF FOOTBRIDGE
BOUND CARRIAGEWAY
/29
Page 30Page 31