SATURDAY, NOVEMBER 19, 1988
23
TRAFFIC CHANGES IN SHA TIN AND FANLING
FACILITATE ROAD
THE TRANSPORT DEPARTMENT ANNOUNCED THAT TO CONSTRUCTION WORKS, THE UNNAMED ROAD IN SHA TIN LINKING AND SHA TIN SECTIONS OF TAI PO ROAD NORTHBOUND, PLAYGROUND, WILL BE CLOSED INTERMITTENTLY FOR TEN BETWEEN 1 AM AND 6.45 AM FROM NOVEMBER 22 TO 26,
NOT BB IN FANLING, ALL VEHICLES WILL
FANLING KCR STATION KERBSIDE LANE OF THE ON TUESDAY (NOVEMBER 22).
THE TAI WAI NEAR TUNG LO VAN MINUTES BACH TIMB
TO ALLOWED
FROM FORECOURT
ENTER THE 2.30 PM
TWO DEPARTURE BAYS IN
AT THE SAME TIME, THE BAN ON THE NORTHERN SECTION OF THE FORECOURT WILL BE LIFTED.
THE
U
t
I
*
I