FRIDAY, OCTOBER 21, 1988
21
NOVEMBER 22 {TUESDAY}
NOVEMBER 23 (WEDNESDAY)
8.30 AM - 5 PM
8.30 AM
11.59 PM
NOVEMBER 24 (THURSDAY}
MIDNIGHT
—
5 PM
NOVEMBER 25 (FRIDAY)
8.30 AM
11.59 PM
NOVEMBER 26 (SATURDAY)
8.30 AM
-
5 PM
NOVEMBER 28 (MONDAY)
8.30 AM
5 PM
NOVEMBER 29 (TUESDAY)
8.30 AM
5 PM
NOVEMBER 30 (WEDNESDAY)
MIDNIGHT
11.59 PM
GRADE SEPARATED INTERSECTION WORKS
AT
BRIDGE AND ASSOCIATED THE GOVERNMENT PROPOSES TO CONSTRUCT A
REPLACE THE SLIP ROADS TO
SIGNAL-CONTROLLED EXISTING
JUNCTION LUNG CHEUNG ROAD/HAMMER HILL ROAD.
ITS
ALREADY OPERATING BEYOND
THROUGHPUT OF LUNG CHEUNG
THE SIGNAL-CONTROLLED JUNCTION IS CAPACITY AND SIGNIFICANTLY AFFECTING THE ROAD, WHICH IS THE ARTERIAL ROUTE LINKING EAST AND WEST KOWLOON.
ENABLE VEHICLES HAMMER HILL AREAS
ON COMPLETION, THE BRIDGE AND SLIP ROADS WILL EXITING FROM THE TATE'S CAIRN TUNNEL TO TRAVEL TO NORTH OF LUNG CHEUNG ROAD.
MAJOR WORKS INCLUDE THE FOLLOWING:
*
*
*
*
THE EXISTING HILL ROAD WITH LUNG
CONSTRUCTION OF A VEHICULAR BRIDGE TO HEPLACE SIGNAL-CONTROLLED JUNCTION OF HAMMER CHEUNG ROAD:
FOR
PEDESTRIANS
CONSTRUCTION OF GRADE SEPARATED FACILITIES TO CROSS HAMMER HILL ROAD AND LUNG CHEUNG ROAD;
ROAD READY
CONSTRUCTION OF A NEW ROUNDABOUT ON HAMMER HILL TO SERVE THE FUTURE FUNG TAK ROAD EXTENSION;
WITH CONSTRUCTION OF SLIP ROADS CONNECTING LUNG CHEUNG ROAD
AND HAMMER HILL ROAD HAMMER HILL ROAD AND CHOI HUNG ROAD, WITH THE FUTURE TATE'S CAIRN TUNNEL;
LUNG CHEUNG ROAD IN THE
WIDENING AND RECONSTRUCTION OF VICINITY OF THE PROPOSED BRIDGE; AND
OTHER ANCILLARY AND ROAD DRAINAGE WORKS.
/CONSTRUCTION IS