TUESDAY, MAY 31, 1988
15
TEMPORARY ROAD CLOSURE IN YUEN LONG
TO FACILITATE THE CONSTRUCTION OF THE TUEN MUN-YUEN LONG LIGHT RAIL TRANSIT SYSTEM, THE JUNCTION OF CASTLE PEAK ROAD AND YUEN LONG ON LOK ROAD WILL BE CLOSED TO TRAFFIC DAILY BETWEEN 12.30 AM AND 5.30 AM FROM JUNE 2 (THURSDAY) TO JUNE 8.
DURING THE CLOSURE, WESTBOUND VEHICLES FROM CASTLE PEAK ROAD HEADING FOR YUEN LONG ON LOK ROAD AND THOSE WISHING ΤΟ TURN RICHT FROM CASTLE PEAK ROAD ONTO ROAD L1 WILL BE DIVERTED TO MAKE U-TURNS VIA THE JUNCTION OF CASTLE PEAK ROAD (YUEN LONG SECTION) AND FUNG CHEUNG ROAD.
TEMPORARY RESTRICTED ZONES IN NORTH POINT TO REMAIN
PM DAILY
THE FOLLOWING
FROM
ZONES RESTRICTED
AT THE 7 AM TO 7 LOCATIONS IN NORTH POINT WILL REMAIN IN FORCE AS SPECIFIED BELOW 10 AM ON FRIDAY (JUNE 3) FOR ROADWORKS:
* FORT STREET FROM ITS JUNCTION WITH NORTH VIEW
POINT ABOUT 57 METRES WEST OF EIGHT WERKS; AND
THAT
JUNCTION
STREET TO A FOR ABOUT
NORTH VIEW STREET FROM * THE WESTERN KERBSIDE LANE OF
JUNCTION WITH FORT STREET TO A POINT ABOUT SIX METRES OF THAT JUNCTION FOR ABOUT FOUR WEEKS.
ITS SOUTH
BE ALLOWED TO STOP
NO VEHICLES EXCEPT FRANCHISED BUSES WILL FOR PASSENGERS OR GOODS WITHIN THE RESTRICTED AREAS.
WATER CUT IN KWAI CHUNG
CHUNG WILL BE ΤΟ 8 AM
FRESH WATER SUPPLY TO CERTAIN PREMISES IN KWAI CUT OFF OR REDUCED IN PRESSURE FROM 9 PM ON FRIDAY (JUNE 3) THE NEXT DAY FOR WATER MAINS WORK.
THE AREA AFFECTED BY THE WATER CUT IS ROAD, LAI KING HILL ROAD, JUNCTION STREET, LAI PEAK ROAD.
BOUNDED BY KWAI CHUNG CHO ROAD AND CASTLE
BOUNDED BY CONTAINER THE AREA WITH REDUCED WATER PRESSURE IS
SHUN STREET, TEXACO PORT ROAD, KWAI TAI ROAD, KWAI YUE STREET, WING
KWAI HING ROAD, KWAI FUK ROAD, SHING FUK STRERT, KWAI SHING CIRCUIT,
LAI CHO ROAD, JUNCTION ROAD, WO TONG TSUI STREET, CASTLE PEAK ROAD,
KWAI CHUNG ROAD AND TSUEN WAN ROAD, STREET, LAI KING HILL ROAD,
SUN TSUEN INCLUDING THE CONTAINER TERMINAL AND ALL BLOCKS OF MEI FOO TO THE SOUTH OF KWAI CHUNG ROAD.